5:23
Miss Rucker, Miss Bennett here, and Mr.
5:38
Um, so we'll start with new business.
5:41
The first on the agenda is 210 Hamilton
5:57
address name is Chris, address 340
6:05
Great. Thank you. Um, first we'll start
6:07
by Jeffrey reading a synopsis.
6:12
Uh, yes. So, the applicant is proposing
6:14
to replace the existing real slate
6:16
shingles on the third floor maner roof
6:18
and dorma roofs with Ecostar synthetic
6:21
slate shingles. Um and uh if uh you've
6:24
seen the photos in the uh case report or
6:27
um did a site visit to the property, uh
6:30
you'd note that uh the there is a pretty
6:33
minimally visible maned roof on the
6:35
third floor of the front of the
6:36
building. Um and uh they'll be replacing
6:40
the slate shingles there uh and on the
6:43
um kind of large A-frame dormer there uh
6:46
with the Ecostar uh synthetic slate
6:50
shingles. Um this is a product that uh
6:52
has been reviewed and approved by the uh
6:55
board before. Um so uh this is not
6:59
proposing a new product. Um and uh the
7:03
uh visibility of the location of work is
7:05
pretty minimal. Um and so it's a pretty
7:09
straightforward uh proposal. Um the
7:12
planning bureau staff is recommending
7:14
the request be approved with the
7:16
following conditions. Uh the applicant
7:18
should utilize a similar slate color to
7:20
the existing shingles. Uh and that's
7:22
just kind of to to maintain the overall
7:25
general appearance of the property. Uh
7:27
and then uh planning bureau staff
7:29
recommends our quest be approved for the
7:30
following reasons. The project is
7:32
similar to other approved proposals for
7:33
replacement of real estate shingles and
7:35
thus there is precedent for the
7:36
allowance of the alternative materials
7:38
and the project involves replacement of
7:40
architectural elements with minimal
7:42
visibility and a low profile along the
7:50
the meeting up to you if you have more
7:55
No, the only thing I would not is that
7:57
we'd be using the fish scale ecoar which
7:59
would mimic exactly what's on on the
8:03
time basically identif going over there.
8:15
would be a similar color, but
8:19
we'll match it up as well as possible. I
8:21
believe it's going to be a bedroom.
8:26
Yeah, those two. We're going to hold it
8:31
Now, was that painted that slate painted
8:35
No, kind of looks like it in the photo
8:37
that it might have. Yeah, that's on
8:45
and um do you know if it was reviewed as
8:53
It's beyond repair. So, fortunately,
9:00
I know sometimes we've asked the owners
9:14
Uh I mean I think there's been
9:16
discussion of that. Uh but I don't know
9:18
that you know the city uh manages like
9:21
an architectural salvage operation or
9:24
even a facility where this stuff could
9:25
be suh stored and then um you know
9:28
resold. Uh so I don't know, you know,
9:32
how we would maybe mandate that or track
9:35
that. Uh obviously it would be
9:36
preferable to retain whatever shingles
9:39
are possible for use, you know, on any
9:42
historic building, preferably in the
9:44
city, but um just because really there's
9:46
not a whole lot of like new slate
9:48
shingles being made uh nowadays. But I
9:51
think at the end of the day, um you
9:53
know, having a requirement like that or
9:54
a condition like that is just you know,
9:57
maybe difficult to enforce.
10:00
We do actually save when we can because
10:03
I get for other slate repairs. I do some
10:05
of that as well. So now I don't know
10:11
take them off and I can save 100 tiles.
10:19
that's what we would like to do.
10:24
Um any other comments from the board
10:32
Um I have a question for the board. Do
10:35
we want to change the condition
10:37
or say that the shall utilize a similar
10:47
shape size and shape or texture maybe
11:03
guess I don't know if you can get a
11:08
Well, I think as opposed to like it's
11:10
Yeah, the rough edge kind of
11:22
looks like a fiship.
11:28
I don't think it has a particular name
11:30
for it. I think Ecoar and Da Vinci both
11:34
naturally. Have that type edge. They
11:37
don't finish an edge of slate in one way
11:40
or the other. That makes sense.
11:47
And I guess I'll make a
11:50
motion modified condition. Second it.
12:15
oppos. Right. Next on the agenda is 227
12:36
I was going to say absolutely not. That
12:38
is not what that says.
12:41
Is that really how it's how it's
12:44
pronounced years without
13:14
Uh yes. So the applicant is proposing to
13:16
replace the existing panled front door.
13:18
uh and transom with a halfu fiberglass
13:20
door featuring panels along with the
13:22
transom. Uh so uh this proposal um you
13:27
know is similar to uh some other
13:30
proposals we've gotten in the past uh
13:32
for replacement uh of doors. Sometimes
13:35
people want to remove like a wood door
13:37
with a half view pane and just put
13:39
something solid in for security reasons.
13:40
And other times we get proposals uh like
13:43
this where it's replacing a solid panel
13:45
door um with uh half pain. Um, and when
13:50
reviewing a project of this of this
13:51
nature, you know, you kind of look to
13:53
the historic district design guidelines,
13:56
uh, which generally discourage the
13:57
replacement of, uh, panled wooden doors
14:00
with, um, fiberglass or modern
14:03
materials, uh, because the profile of
14:06
the of the panels and the recessed areas
14:08
isn't quite the same. And in this case,
14:10
we're adding a um, uh, halfview pane as
14:13
well. Um I think when I uh went out and
14:16
did a site visit um you know I noted
14:19
that uh in addition to like this
14:22
proposal and this aspect is not um
14:24
relevant maybe necessarily to this
14:26
particular project and it's not
14:28
certainly the applicant's responsibility
14:30
but it appears that a previous owner uh
14:32
replaced some of the u windows on the
14:35
property uh took two over two windows
14:37
out and put in one over one windows. Uh
14:40
there were some other aspects uh like uh
14:42
mini split system put in um and some
14:45
other changes to the building that uh
14:46
you know didn't go through uh the harb
14:49
approval or as far as I can tell get
14:51
city uh permits. Um and so you know when
14:54
looking at this I'm looking at it almost
14:56
as a continuation of that where the um
14:58
historic nature of this building has um
15:01
kind of slowly been uh degraded uh and
15:03
erased. And so I think this uh proposal
15:06
would be kind of a step in that similar
15:08
direction. Um, and you know, there are
15:12
um existing products out there like
15:14
wooden doors, wooden panel doors
15:16
especially, uh, that could be used to
15:18
replace this. Um, you know, I think
15:20
it's, you know, evident as wood door
15:21
when you go up to it. You can kind of
15:23
see some peeling paint. Um, but the, uh,
15:25
proposed door would be a pretty
15:27
significant change, uh, from the current
15:29
appearance. And again, because it's
15:31
right up against the sidewalk and is not
15:33
set back like underneath a porch or
15:35
something like that, it's even more
15:36
conspicuous than it might otherwise be.
15:38
Um so for that reason um the uh plan
15:42
bureau is recommending the request be
15:43
denied um uh because the proposal to
15:46
replace a paneled wooden door with a
15:48
fiberglass door with a half view pane is
15:50
not an appropriate or necessary
15:51
alteration to an existing historically
15:53
appropriate feature. Uh because the
15:55
building does not have a front porch to
15:56
obscure the proposed change and the
15:58
location of work is in the touch zone.
15:59
The alteration will be conspicuous and
16:01
visible from the public right ofway. And
16:03
the applicant has the option of
16:04
installing a new wooden or wood
16:06
composite panel door if the existing
16:08
door requires replacement for either
16:09
security or energy efficiency reasons.
16:23
anything if I may. So um the homeowners
16:29
Okay. With replacing the door and
16:32
currently it would have glass and just
16:35
go back to the six panel door as you
16:38
have with regards to the the previous
16:41
steps that previous owner have
16:47
did. Uh the only thing that I would like
16:56
and obviously contacted us for the
16:59
purpose of getting this done because
17:02
safety not to say anything we know about
17:04
that block or that part of the city but
17:07
things can happen and being a single
17:09
homeowner that is so we have to go in
17:13
full battle just the way it appears I
17:18
that we are all to do
17:35
Um, I noticed that there's three doors.
17:38
Yes, two of them would be on the side.
17:47
appearance. The front were actually
17:50
instead of Six panel solid.
18:10
Is there some reason why given that you
18:13
wouldn't be doing the door you had in
18:15
mind, you couldn't just keep the
18:17
original door or the existing
18:35
and a new door would have equal
19:01
So the six panel that you're talking
19:05
so it is fiberglass but the the outside
19:09
would be of what would be a composite.
19:16
have the necessity for
19:45
measure. We actually uh had one of our
20:04
door. So we are in all all steps.
20:26
thoughts they go with this fiberglass
20:29
with the positive exterior.
20:32
Yeah. Uh you know I saw that in the um
20:35
in the case documentation that I think
20:38
there's like fiber core and then a
20:40
fiberglass outside of uh the um on the
20:44
exterior of the door. Uh I know the the
20:47
the board has approved fiberglass doors
20:50
in the past. Um I think in some cases
20:53
the conditions are a little or the
20:55
circumstances of the property are a
20:57
little bit different. Maybe you have a
20:59
you know existing vinyl door or existing
21:01
fiberglass door or something like that.
21:04
um or it's a particular size uh and it
21:06
needs to um have that you know ideally
21:09
it would be um you know wood door but I
21:12
think if there's a compromise to be made
21:14
and it sounds like the applicants are
21:16
you know willing to compromise on the
21:18
design of it I think um there's some
21:20
justification for um you know an
21:23
allowance of the material I I think in
21:27
um I don't know whether it's uh this um
21:30
manufacturer or installer or it was
21:32
another one but They said that the
21:34
fiberglass was paintable. Um, so I don't
21:36
know if if yours is or not. So it is
21:38
paintable, which I know is one of the,
21:40
you know, long-standing
21:42
um, you know, issues of of every review
21:45
that the board does is the paintability
21:46
of of the product. And if the product's
21:48
paintable, um, I think there's, um, you
21:51
know, that certainly helps, uh, in
21:53
support of the applicant's position.
22:00
Does Anderson do a wood composite door?
22:04
What we have is what we are proposing
22:07
here that not a full the door itself.
22:21
Currently we are not offer
22:27
approved in several areas of the city.
22:46
So that's exactly what you're what
22:48
you're looking at here. That's what we
22:49
would evidence. That's what he has.
23:38
those. The door be the
24:00
Thank you. Thank you.
24:25
Next on the agenda is 308.
24:42
Your name and address.
24:56
Uh yes. So the applicant is proposing to
24:59
replace the five existing wooden windows
25:01
on the front elevation uh with fibrics
25:03
with fibbrric windows. Uh and uh the
25:06
request should I guess be modified to
25:09
note that only the first floor window uh
25:10
would be packed out um by one inch on
25:13
either side. Uh as noted in the applic
25:16
as noted in the application uh the
25:18
existing the other four windows on the
25:20
second and third floors I think would
25:21
just uh be matching existing profile of
25:24
the window. Um so in looking at
25:26
something like this I know um
25:30
the board has generally discouraged uh
25:34
packing out uh it changes the appearance
25:36
and the kind of the profile of the
25:38
window. Um in this case I think we were
25:42
balancing a couple things. So, one of
25:45
the things uh was that the applicants
25:48
noted their only this is they couldn't
25:51
make a product that was the same size as
25:53
the existing uh window frame. Um so that
25:56
would mean that the alternative would be
25:59
doing like a play glass window. Um so I
26:01
have something similar in my front um
26:04
the front window on my first floor uh
26:06
where replaced a big double hung with a
26:08
a picture window. Um and maybe you could
26:10
put you know a fake check rail in the
26:12
middle of that. um to replicate the
26:15
appearance of a double hung window.
26:18
Um or the alternative would be, you
26:21
know, allowing the applicant to uh
26:23
install the window as proposed. And I
26:26
noted that in looking at the window, the
26:28
check rail is actually somewhat
26:29
offcentered uh on the overall window
26:31
frame. And the proposed window uh also
26:34
has that offset to the check rails. So
26:37
uh you know, this is kind of um one that
26:39
I think could go either way. Um and when
26:42
considering it, I really thought that um
26:47
greater contributo element I guess uh
26:50
would be the offset check rail as
26:52
opposed to the overall you know profile
26:54
sides of the window. Uh and so the
26:57
question came down to well we recommend
26:59
denial or a condition with approval with
27:01
a different type of window. What would
27:02
that be? Um, and again, it couldn't be a
27:05
fiber window um or a wood composite
27:08
window of the exact same size. It would
27:10
have to be a picture window with like a
27:13
a simulated uh check rail in it. Uh or
27:15
it could be what the applicants are
27:17
proposing. And so, uh while I know that
27:19
I know the board's position on uh
27:21
packing out windows, um it seemed in
27:24
this case like it may be the lesser of
27:26
two evils uh when it comes to the uh
27:29
replacement of these windows. And
27:31
obviously as they're replacing the
27:32
windows on the upper floors too, you
27:34
kind of want a continual appearance um
27:37
between all the windows on the property.
27:39
So it'd be one where I don't know that
27:42
it would necessarily be the best idea to
27:45
say, well, we'll approve the four
27:47
windows on the second and third floor
27:48
and not the first floor window. I think
27:50
that would be even more conspicuous than
27:52
um you know what some of the other
27:55
options would be. Um so uh with that
27:58
being said uh the planning bureau
28:00
recommended uh the request be approved
28:04
um for uh the following reasons. Uh the
28:07
proposed window material is
28:08
administratively approvable per the
28:10
historic district design guidelines. And
28:12
although the project represents an
28:13
alteration which is discouraged by the
28:15
board due to the visible impact on the
28:16
architectural feature, the alternative
28:18
of a picture window would be a more
28:19
conspicuous change. Um, aside from the
28:21
proposed f first floor replacement
28:23
window, the project can otherwise be
28:24
administratively approved as presented.
28:26
Uh, and finally, the project will
28:28
replicate the off-centered check rail
28:29
between the top and bottom sashes of the
28:31
existing window. Um, so again, I think,
28:35
you know, this could have really gone
28:36
either way and I'm sure there may be,
28:38
you know, some indecision on behalf of
28:41
the board members on which way to go in
28:43
this case, but um, the planning bureau
28:45
felt that this was a pre more preferable
28:48
option to the alternative of a picture
28:50
window with the simulated check rail.
28:57
Um, we can make a picture window the
29:01
correct size. What we were trying to do
29:04
was match the double hung on the house
29:06
that's attached to it, like within
29:09
inches of that window. There's another
29:11
one on the next home. So, the homeowner,
29:14
we wanted to try to keep that. We
29:15
figured that was going to be an easier
29:18
approval process than going to a picture
29:20
window. So the the it's the overall
29:24
United that window that's giving us an
29:26
issue. It's the same thing when we did
29:28
the window at your home. We're talking
29:31
about a thumbs width on each side. Um
29:34
and on a 50inch wide window that's going
29:37
to be harder to pick up on than if we
29:41
make a picture window with like a
29:42
simulated check rail. I think that that
29:44
will look worse than like sash, you
29:48
know, because it's just a piece of glass
29:52
where the sashes aren't offset and that.
29:54
So, the double home's going to look much
29:56
better as you're driving by, then you
29:59
won't you would have a really hard time
30:01
noticing one inch on each side of that
30:09
Can you explain the one inch uh
30:13
so I can make No, I can make it would be
30:17
on the width. So, I can make the width,
30:19
but then I can't get the height. I can
30:21
make the height, but then I can't quite
30:23
get the width. So, we're like two inches
30:26
too big on the the overall size of that
30:30
opening. So, it was going to look better
30:34
uh because we can slope the sills on our
30:36
double hungs to match the slope sills of
30:38
the original windows, it was going to
30:39
look better to lose the inch on the
30:42
sides than at the top and
30:46
bottom. We can nicer that way. And then
30:49
on the interior, it has the existing
30:52
original wood stops. They almost cover
30:56
most of that packing and we're just
30:58
going to have a little bit on the the
31:00
inside to touch up on. So, but it'll
31:02
look much better with the double hung
31:04
being out front. So, you're there's
31:10
Um, again, that's all staying original.
31:13
So, the homeowner, he travels a lot for
31:15
work. He knows that he needs there's
31:17
some uh wood work that needs to be done
31:19
and like the box sills and whatnot. He's
31:22
going to paint that to match because our
31:24
color is pretty close and he's going to
31:26
paint the wood trim around to match the
31:29
window once he gets the wood repair
31:34
And then what is the full exposure of
31:37
I don't know. The size of the width of
31:42
the overall unit is going to be The
31:45
overall unit width is 48 in wide is what
31:48
we can make. You go into that opening. I
31:52
would say 3 in from there to start the
31:55
glass. I don't know. The sash
31:57
is 2 in wide the whole way around. It's
32:00
very accurate. So, so like original wood
32:03
windows. Okay. But so it look like two
32:06
inches on the top, three inches on the
32:08
sides, two inch. Oh, is it you're
32:12
talking about the border around the
32:13
window. I don't think you're because
32:16
there's box sills below it. So, that's
32:20
going to blend in nicer. Um, and then at
32:22
the top there's more than likely
32:23
decorative trim um around that window.
32:27
So I don't think if you're are you
32:29
talking about like the
32:30
profile around the window where we
32:37
be our window is 3 in from frame to
32:41
glass and then we're going to have about
32:43
an inch on each side. So you'll have
32:51
only two inches of like finishing
32:54
material from our window over to the
32:56
existing trim and then the rest will be
32:58
window sash like sashes
33:01
operating that what you were looking for
33:04
each side or I guess I'm confused on
33:06
what your question was that two inch on
33:09
each side or one inch each it's one inch
33:11
on each side but then the finishing
33:13
covers support our window frame. So,
33:15
that's where I got, you know, you're
33:16
going to we're going to use what we
33:18
typically use in Harrisburg is um called
33:21
Ftrim or Ltrim and it's made out of the
33:23
fiber material. Um you'll probably have
33:26
about a 2 inch wide piece of that
33:28
running around, but it's covering up a
33:30
portion of our frame. It's covering up
33:32
the whole window frame. It snaps into
33:35
that. You want to see some pictures of
33:38
like of like before and afters or
33:43
I don't have them of that house, but I
33:50
Yeah, it's we've been using
33:56
for 10 years, I think. Yeah, I was going
33:59
to say I think the first couple
34:01
instances we had were maybe like 2014,
34:04
2015, and I think there had been
34:06
administrative approval starting like
34:08
2016, 2017 or something. I think was
34:10
when the board took a vote to grant
34:13
administrative approval to it.
34:20
I understand the description.
34:28
Um I you know I I think to um you know
34:32
the applicant's uh point because it's
34:36
not just a simple brick mold frame all
34:38
the way around uh and kind of to your
34:40
point of like well it would be two
34:41
inches on the top then and three inches
34:43
on the side because you have those like
34:44
chunkier headers and sills. Uh the
34:48
additional width on the sides is going
34:52
to be less noticeable because of those
34:53
bigger blocks on the on the top and
34:56
bottom of the window. If it were just,
34:57
you know, brick mold all the way around
34:59
and you just like put a window in there,
35:00
which we have those windows in in the
35:02
city, um I think it would probably the
35:05
change would be more evident. Um but I
35:07
think due to the nature of the um
35:09
existing uh conditions, I think it'll be
35:12
less visible and and I think like I
35:15
said, at the end of the day, it seems to
35:17
me that the more you know, unique aspect
35:19
is the offset check rail in this window.
35:23
so a replacement that can replicate that
35:26
is probably preferable over something
35:29
that's just again a picture.
35:33
Find an image that you share with I have
35:36
a a few um you want to bring it up.
35:47
So this is cornal but like same age,
35:51
right? But we did bottom two windows,
35:54
top three are still original.
35:57
And this is packed out with the one.
35:59
These didn't necessarily need to be
36:00
packed out, but there's not a whole lot
36:03
of difference. And these are much
36:06
smaller windows. So on a 50-inch wide
36:08
window, that's that's the issue. We're
36:10
talking about a thumb on each side. And
36:15
you there's going to width difference
36:17
between this window and this window just
36:19
because you're setting inside the
36:21
existing framing that's already
36:37
there right side windows
36:40
original left side replacements
36:45
So there's like some slight profile
36:48
differences, but driving past and seeing
36:50
that is going to be much harder to see
36:55
the a 2 in wider picture window
37:00
in cuz the homeowner was trying to match
37:03
the window that's like 2 feet over in
37:05
the neighbor's home.
37:13
It's very very close.
37:26
I like the idea of keeping an operable
37:38
that at least from my perspective I
37:40
would be okay with approving this but
37:42
not having it set the precedent that
37:45
this would be a one time only approval
37:49
particular alteration
37:54
that month from now someone says well
38:04
and I and I do always um you know inform
38:08
everybody that uh that board decisions
38:11
are not presidential. They're based on
38:14
the circumstances of each particular
38:16
property and each particular project. Um
38:18
and therefore approval of a particular
38:21
material or product for one property is
38:23
not necessarily going to be given for
38:24
another. again, if you're have a door
38:26
right up to the sidewalk or step back on
38:28
a in a in a porch. Um, so I do make a
38:31
note of that, but including it in the
38:33
actual uh resolution is, you know,
38:36
probably helpful to anybody that may
38:38
want to read that for the future.
38:52
Motion. I make a motion to approve
38:57
Connie's recommend with the addition.
39:15
I motion carries. Thank you very much.
39:40
business continue what was discussed
39:44
month of the project.
39:50
your name and address.
40:00
Yeah, I gave you I gave you the
40:02
PowerPoint, the print out. I actually
40:04
have um the specifics on the paint and
40:06
the masonry I think from last meeting
40:08
too, just in case you had follow
40:10
questions about that. But the PowerPoint
40:12
that you have is the one um that they
40:14
had provided for this meeting. I think
40:19
photographs in there because it was too
40:39
Peter from 6608 North place
40:59
Um, you know, not much additional beyond
41:02
uh last month's discussion. Um, we did
41:04
have a a follow-up meeting where we
41:06
discussed some of the feedback that the
41:08
board provided at last month's meeting.
41:11
um and some maybe additional uh
41:14
information that the consultant team may
41:16
want to provide uh for this particular
41:20
uh presentation. And if you'll note on I
41:23
guess the seventh page of the um
41:26
PowerPoint uh they have a kind of
41:28
comparison chart of the um materials uh
41:33
that are involved in this uh
41:34
reconstruction. some of the major
41:36
materials that are involved in the
41:37
reconstruction. Um, you know, roof,
41:39
walls, windows, uh, doors, and it kind
41:42
of has a breakdown of what it was
41:45
originally, if known. Um, what might
41:48
have happened or what happened in the
41:49
1970s when there was a reconstruction
41:52
project and then in the '9s during that
41:54
reconstruction project, which we
41:55
discussed at the last meeting, and then
41:57
finally this current proposal. So, I
41:59
think it it's designed to uh help the
42:02
public and the board understand and kind
42:04
of track like what's being changed. Is
42:07
this a change from the original or is
42:09
this a change from the most recent
42:11
reconstruction of the of the property?
42:14
And therefore, it might be different
42:16
from what we are used to seeing as
42:18
residents of the city. Uh but that's not
42:20
necessarily means it's any less historic
42:22
or less appropriate uh than what was
42:25
there previously. Uh so that's what that
42:27
charter is designed to do. Um and I
42:29
think uh the consultant team will um
42:32
probably expand a little bit upon that
42:34
and um maybe address some of the other
42:37
uh questions or issues that were brought
42:39
up by the board at the last meeting.
42:43
I just want to make one clarification. I
42:45
didn't say I just said it was the Broad
42:47
Street Market, but focus is the brick
42:50
building today. There might be comments
43:03
um guess go through your PowerPoint with
43:10
Um so, I'll start with uh page two. Um
43:14
it's some of the photos that were
43:17
previously presented at the last
43:19
meeting. Um again, these are the photos
43:21
we've been in our research um using as
43:25
um items or checkpoints to go back into
43:29
try to tell the story of what was
43:30
previously there and how the building
43:38
um some historical photos. The one note
43:41
on the right is the is the structure
43:43
that was previously in the plaza and
44:05
dark is also some more um images. Um
44:14
on the image on um we did reach out to
44:24
well that he sent back to us. Um did
44:28
learn this image is from 1890.
44:42
So like Jeffrey was just saying we did
44:45
compile a chart to uh sort of explain
44:48
the evolution of various elements of the
44:51
building and what we're proposing and in
44:53
a lot of the cases we are going back to
44:57
the what is the original um because in
45:01
the 70s they they made some some very
45:04
drastic changes um and then again in the
45:07
'9s Some of those changes went back to
45:10
the original and others did not. So we
45:12
are trying to reference the 1890s image
45:22
windows. We'll get to the roof as well
45:25
because there's some changes
45:37
much has changed since the last uh the
45:40
meeting existing walls are two widths um
45:44
with space in between. Um and usually uh
45:50
bricks every seven to kind of help tie
45:52
it together. Um but it needs some
45:56
stabilization to graph of the center
45:59
void um and point to an exterior size
46:04
wall and also metal stuff on the
46:07
interior side um to stabilize the wall
46:18
um issues that we discovered some of the
46:29
to place the select bricks if they're
46:32
really bad shape ways to possibly
47:05
We didn't find out what the um issue
47:08
was. So they weren't able to actually
47:10
scope the the down spout. So we're going
47:12
to actually part of the project we're
47:14
going to replace all the down spouts and
47:16
underground basically. So that was one
47:19
of the problems where we um we are
47:23
trying to get more information from the
47:25
geo with the water table. water tables
47:28
roughly 10 ft low rate which should be
47:31
below us but there's still concerns
47:33
possibly we have a a wet season that it
47:37
might rise up for for small periods of
47:40
time so we're still looking at
47:43
waterproofing the existing
47:47
we are I think we talked about this last
47:49
time we're removing the slab inside so
47:52
we can get to the foundations for
47:54
repairs from the inside and Basically
47:57
all of the sidewalk along the north and
47:59
south side will be coming out for
48:01
replacement of infrastructure and
48:06
um a foundation drain will also help
48:10
drainage so if it does rise can drain
48:14
doesn't get absorbed.
48:25
No we're fill the cavity. So, we're
48:52
mebring section. That's the section
49:04
as well. We're all on the same page.
49:12
it's on the following slide.
49:30
interior elevation showing
50:12
photo is an example of um the door
50:25
transmosing as we did last month to take
50:53
They were solid panel.
50:59
There was there's glass inserts current
51:01
like prior to our project. This is the
51:05
'9s replacement doors which were not
51:08
authentic. Didn't look like it did. So
51:11
we're going back. We're going to go back
51:16
exterior east and west elevations.
51:19
There's a six that was used in photo and
51:23
then on the the east I mean north and
51:29
elevation lower eleing
51:49
to have the interior set of the
51:56
doors that way. Um the other thing too
52:00
is originally the doors were out.
52:04
Um you can kind of see that door slide
52:08
that I referenced. There's kind of a
52:11
recess for the doors that we're going to
52:14
have that as well. That's more
52:28
and west entrances will have 88 push
52:46
The next slide on slide 17 is
53:05
photo. So this slide that has
53:09
various images is just showing it's just
53:13
illustrating the changes that were made.
53:16
So in the 70s they actually broke the
53:19
transoms into two separate pieces. The
53:21
lower piece of the transom was operable.
53:25
The upper piece was fixed and they
53:27
actually recessed the lower transm with
53:30
the door. Um and then in the 90s
53:33
renovation they they tried to go back
53:37
to historically but I still think they
53:41
quite make it match. Um so You can just
53:46
see the evolution rightosing what we
53:48
feel is the closest match how it
53:59
wasn't getting to windows.
54:02
Um we are looking at the bigger windows
54:08
those back historically. So in this
54:20
199 we're working with to do um a
54:25
size middle windows because we think
54:28
originally they probably didn't they
54:30
weren't able to manufacture or install
54:34
window because it is so large. So the
54:37
middle mountain will be a wider
54:39
profile to mimic the original
54:45
today because we do want to continue the
54:48
conversation of the aluminum windows. We
54:51
also brought a sample of a composite
54:54
window. Um we have learned from that
54:59
they cannot manufacture the first
55:21
can. So this obviously exact window
55:26
we're proposing but we wanted to show
55:30
materiality we talked a bit about the
55:34
simulated divided lakes. Um so this is
55:44
month and the the divider piece will
55:51
light this one shows that metal finish
55:55
and you can see it more because it
55:58
reflects light but these are the
56:00
composite windows and you can see the
56:02
the lines are just not as crisp and
56:13
We have some details in the next sheets
56:16
that show we've been studying all of the
56:19
we don't have any original
56:24
are windows there which
56:29
presumably to the original windows but
56:32
also just the proportions and the
56:58
is the way to go with you know be
57:13
That's the reason behind it.
57:46
here nowing a fully operable double
57:50
double hung windows. Um so Marvin has a
57:54
hardware that they can lock the
57:59
So it can only be operated with key
58:01
which means it can still be operated but
58:07
you need to ventilation that's
58:12
well the building will be climate
58:13
controlled though that's the thing like
58:15
you probably we probably don't want
58:16
people opening the windows um when the
58:19
AC's on or the heat's
58:21
on they make the air go they
58:44
any screens. It really would interfere
58:48
with the appearance.
58:54
So the operation would only would be
58:59
limited not by people in the market but
59:06
and that's the first one or the story as
59:17
So um these details we're still
59:20
developing these details but have
59:23
met the manufacturer to discuss and
59:30
um discuss how the windows are going to
59:33
integrate into the existing building.
59:35
We're not modifying any of the
59:39
um talked about last time we are
59:42
replacing all of the sills which had
59:44
been replaced in the 90s. They don't
59:46
quite fit the openings.
59:50
So, we're proposing a
1:00:04
there were more closely, but we did all
1:00:13
details. We pulled a couple
1:00:15
of projects that were approved by the
1:00:19
register of historic places. So um the
1:00:34
era7 that range a little bit earlier
1:00:41
but they were all custom made by
1:00:58
national station. So very similar era
1:01:02
um aluminum custom wood windows by were
1:01:08
approved for this project also in the
1:01:12
national like these are two that are
1:01:56
Uh yeah, we do right before the um
1:02:03
um I mean we did find this on
1:02:08
um on the National Park Service
1:02:10
rehabilitation guidelines uh
1:02:13
did state that for example C types of
1:02:17
large buildings particularly highrises
1:02:19
um which is not but um building room
1:02:22
windows may be suitable for historic
1:02:26
wood are not practical and the design
1:02:41
Then question about
1:02:46
windows. We'll move on to the paint
1:02:48
analysis. I think we talked about last
1:02:50
time we did um take 23 samples from
1:02:55
various locations building for paint
1:02:57
analysis. There were only really three
1:03:00
on the exterior that were usable paint
1:03:03
samples um because there was so much
1:03:05
charring on the paint that a lot of it
1:03:07
was not usable. Um but these these are
1:03:11
the three colors that we did find
1:03:23
images. We also talked a little bit last
1:03:29
historic image for the pink colors going
1:03:33
away from just all white trim to
1:03:40
Next building is a another project we
1:03:54
Gettysburg. We presented several
1:03:57
options palettes using a lot of the same
1:04:00
colors from the analysis. We presented
1:04:04
it to the the market board and the small
1:04:08
we everyone read the option list which
1:04:12
is what we're showing
1:04:20
here in a solid color whereas the doors
1:04:25
will be used by public would have a
1:04:28
two-tone palette where the base panels
1:04:31
are a lighter color the styles and rails
1:04:33
are probably darker
1:04:39
And just for clarity, where's the red
1:04:42
going? Is that on the bracket?
1:05:00
also, so we're trying to tone versus
1:05:25
detail. I know there was some comments
1:06:00
series 1300 series.
1:06:06
What's the difference in the cost? We're
1:06:08
still working on the cost. Um but we
1:06:12
think on the loan it'll it'll work
1:06:13
itself out. I think on
1:06:17
the we did we did have a meeting today
1:06:20
actually um that it would probably be
1:06:22
around double the cost um cost of it
1:06:46
color the details but we're trying to
1:06:49
find the smallest standing seam profile
1:06:58
updated session last
1:07:07
time. Um so the the red lines on
1:07:12
the minimally changing the pitch um we
1:07:15
need to get ination
1:07:24
understand but there's
1:07:29
ways piece that's that goes against the
1:07:34
brick better system we think there's
1:07:38
of those up to minimize the impact
1:08:20
have one question. Um, in a meeting
1:08:24
recently, someone asked about the
1:08:29
Were you able to manufacture?
1:08:40
We were actually taking they're removing
1:08:56
bricks. This green
1:09:02
different bricks. So the bricks are
1:09:03
different sizes exterior for the three
1:09:06
different pieces and
1:09:26
right, I'm impressed.
1:09:35
Um, yeah, I guess if you wanted to go
1:09:38
through your last slide there of the
1:09:44
no, it was just if there was any
1:09:46
comments that we needed to talk about
1:09:47
the site, we just included,
1:09:51
what is the scope of work on the site
1:09:53
for the brick building? said you were
1:09:55
talking about taking off the concrete
1:09:58
floors to get downations but people
1:10:10
and for interior of
1:10:14
the building I understand the systems
1:10:24
at separate. No, that's that's starting
1:10:28
to evolve right now. Right. So there is
1:10:30
not what's being proposed right now is
1:10:33
there's not a central plan.
1:10:36
We're proposing um to put a chiller pack
1:10:39
system which would be in the parking
1:10:58
here and then find a way to shall
1:11:07
We're exploring it now and then the
1:11:10
chillers will be fed below the
1:11:14
street and as well
1:11:19
we're never going to be
1:11:25
able to find a house for
1:11:34
same basically left very little.
1:11:47
area. It'll be space,
1:11:53
but you won't need
1:12:17
wall side that kind of splits it. We're
1:12:30
side or it' be on the first story.
1:12:33
There's a high window.
1:12:36
There's like a higher window that's
1:13:01
not members of the public
1:13:05
here. wanted to bring up to your
1:13:07
attention and we're looking
1:13:09
at specifically today. I can understand
1:13:13
that to be the first phase
1:13:24
project. Do you have comments you wanted
1:13:30
this procedure is name address for the
1:13:41
I serve on the task
1:13:44
force. They meet every other Tuesday
1:13:47
with the architects and I'm very
1:13:50
impressed. I just want to say that for
1:13:52
the record. The way in which the
1:13:54
architects have approached this project
1:13:57
both with respect to being diligent with
1:13:58
historic photography, paint colors and
1:14:02
other attributes of the project. I just
1:14:05
wanted to mention that from my
1:14:06
standpoint speaking on behalf of
1:14:09
historic from my standpoint very
1:14:11
impressed. The only other question uh is
1:14:15
state historic preservation office is
1:14:17
also I think in the process of reviewing
1:14:19
these plans and whether or not there's
1:14:21
been any feedback from them and that is
1:14:24
requirement based on the federal
1:14:26
undertaking some grant funds involved
1:14:29
here that does kick in that state. So I
1:14:34
don't know Jeffrey can you comment on
1:14:36
that? Uh I don't believe I've received
1:14:38
anything yet. I don't know if the
1:14:42
So we we did get a preliminary uh review
1:14:45
better and it was only based off of our
1:14:48
schematic design submission. So they
1:14:50
haven't seen the development of the
1:14:51
design. So we need to have that
1:14:53
conversation with them but um they did
1:14:55
make the same comment that you guys did
1:14:57
um that their preference was for a metal
1:15:00
just we've made that change. um a couple
1:15:06
uh comments comments on the interior
1:15:12
but I don't think it were really any
1:15:15
different than what we had discussed
1:15:17
with you guys last
1:15:19
month. Just in support of your metal
1:15:21
roof, which I'm really glad that you've
1:15:25
I did a little research too trying to
1:15:28
find um some information and could not
1:15:31
find anything on this building in
1:15:33
historic newspapers, but there were
1:15:34
building they were building another new
1:15:38
market in 1872 on Market Street and they
1:15:42
were using a metal on that
1:16:03
But again, it would appear that the
1:16:04
state preservation office is in the
1:16:13
What's the maintenance on a metal roof?
1:16:37
expect color so it'll have a high
1:16:40
reflectivity and less prone to fading
1:16:43
than a darker color.
1:16:51
So, do they them over paint?
1:16:56
You can't paint over
1:17:05
the is 35 years for the finish. Oh, for
1:17:12
I think there'll be some date. I
1:17:36
much. Josh Kesler, city
1:17:42
res. I think these guys have done a
1:17:44
fantastic job. I came
1:17:51
exior but I went through the plan I
1:17:53
support you know all of it was very
1:17:58
thought on the windows very historically
1:18:08
necessary so you know it's a little more
1:18:11
upfront cost first but longevity
1:18:19
is full support of proposals any other
1:18:24
changes maneuvers or other things that
1:18:54
Street about indoors as someone who's
1:18:57
not quite tall enough to reach the glass
1:19:06
out for people to see each other coming
1:19:08
in and out a good idea.
1:19:17
What are the steps now?
1:19:31
So I think so the um um uh formal COA
1:19:36
application is not being filed um as
1:19:38
part of this project. Uh uh which is why
1:19:41
this was introduced under other
1:19:42
business. Um that was um a
1:19:45
recommendation of the of the S's law
1:19:47
bureau. Um so uh from here I guess uh
1:19:52
the board if you have any last comments
1:19:56
that you would like to make.
1:19:58
um any statements in one way or another
1:20:03
uh to um you know express the board's
1:20:05
feelings about the particular project
1:20:07
but I believe um you know there wouldn't
1:20:11
be a formal COA uh resolution to go to
1:20:14
the to city council although city
1:20:15
council will of course be um getting uh
1:20:18
this documentation they would be voting
1:20:20
on various aspects of I'm sure contracts
1:20:23
and stuff like that uh so this will be
1:20:26
going to city council in something.
1:20:45
So I'm not sure that it it doesn't but
1:20:48
that city council is going to ultimately
1:20:51
get this right. So essentially if you
1:20:53
guys did it your step one right city
1:20:56
council it always essentially goes
1:20:58
there. So, we're just making sure that
1:21:00
you guys have any questions, comments,
1:21:02
that was the presation. That's what that
1:21:04
for. I guess it's turning on now. Um,
1:21:08
but essentially, again, as Mr. Knight
1:21:10
said, if you guys have any questions,
1:21:12
comments that you would like that
1:21:14
record, obviously, let Jeff know. It'll
1:21:16
get to city council. Um, but something
1:21:21
essentially that city
1:21:42
sitt first. So there's going to be
1:21:46
funding which is why he was talking
1:21:48
about chip which means there's a section
1:21:51
106 process that you're going through
1:21:53
and so there should be
1:21:56
consultation and I'm wondering if it's
1:21:58
to have a member of the of AARB on the
1:22:02
as a consulting party there's nothing
1:22:05
nothing actually to
1:22:08
likeational front so there's nothing for
1:22:10
it to actually like action
1:22:14
I think your your comment was a little
1:22:16
different right your comment was in the
1:22:17
national review scope because they're
1:22:20
using federal funds, they have to do
1:22:24
what's called section 106 review, which
1:22:27
requires you to have consulting parties,
1:22:29
people who are interested parties to
1:22:32
attend and talk about the project. And
1:22:34
I'm wondering if shouldn't there be
1:22:37
someone from ARB on as a
1:22:48
How is this going to happen?
1:22:51
Yeah. I'm wondering whether that city
1:22:53
question. It's interested parties. It's
1:22:56
it's not the city doesn't get to decide
1:22:58
that necessarily. We would disagree with
1:23:03
That's fine. We own the building. We own
1:23:05
the property. We owe the money. We have
1:23:07
the insurance files. We have the
1:23:08
applications. The city will have
1:23:10
everything to say about it. Oh. Oh, no.
1:23:13
I'm not saying the city doesn't have
1:23:14
anything to say about it. saying that a
1:23:16
consulting party isn't just a by the
1:23:19
city. I got that part. I'm saying but
1:23:21
but how it goes forward there's there's
1:23:24
many many parts to this thing but we
1:23:27
have we have an insurance company to
1:23:28
answer to at the end of the day federal
1:23:30
money what's here will be a minuscule
1:23:33
part of the entire thing which phase
1:23:35
it's in will be an issue that's still
1:23:37
not resolved. minuscule or not, if you
1:23:39
have federal funding, you have to go
1:23:41
through this consulting party
1:23:44
process. I would I would just suggest
1:23:47
that if it comes if there's an
1:23:50
opportunity that maybe president of this
1:23:52
board should be consulting part and we
1:23:56
haven't gotten to that step yet. Yeah,
1:24:01
But when it when Shipo is starting that
1:24:03
read, then that's when start to come up
1:24:07
with that's when I think Trina
1:24:24
well position rather than the name.
1:24:33
Um, so are there comments that we want
1:24:40
forward? The only thing that I see
1:25:03
Yeah question last month you g a short
1:25:07
synopsis shingle and you had something
1:25:10
about the insulation build up now that
1:25:13
it's metal clad that's what I was trying
1:25:16
to trying to change the
1:25:19
profile but it's still the six
1:25:22
insulation is still going
1:25:30
because current energy
1:25:32
code installation.
1:25:38
So, we've got wood
1:25:39
doors. Made comment
1:25:42
about swing of the doors.
1:25:46
Now, just traffic. Hopefully, it will
1:25:53
excuse me. Are there still two sets of
1:25:56
doors at each entrance?
1:26:02
like some back of house for just
1:26:16
Any other concerns?
1:26:41
the use to the city
1:26:54
If there's no other
1:26:57
business to adjourn