Harrisburg Architectural Review Board Meeting 5-5-2025

1:27:07859 summary words · ~4 min readEnglishBy The City of Harrisburg - WHBG20Transcribed Jun 15, 2026
Analyze another video with Pro30-day money-back guarantee
Summary

The Harrisburg Architectural Review Board approved synthetic slate roofing for 210 Hamilton Street, negotiated compromises on alternative door and window materials for residential properties, and reviewed key design updates for the historic Broad Street Market brick building restoration.

This meeting highlights the practical challenges of balancing strict historic preservation standards with modern energy-efficiency needs and material availability, particularly during the ongoing federally funded restoration of Harrisburg's landmark Broad Street Market.

Section summaries

0:00-4:22

Call to Order & Roll Call

skip

The meeting is called to order, the roll is taken, and board members present are confirmed. Board staff transition directly into addressing the first item under new business.

This contains routine administrative roll calls and introductory remarks with no project-specific information.

4:22-10:55

210 Hamilton Street - Synthetic Slate Roof

watch

Review of the proposal to replace degraded slate shingles with fish-scale Ecostar synthetic shingles. The Board discusses salvage limitations, color-matching conditions, and ultimately approves the proposal with modified conditions emphasizing size, shape, and texture matching.

It offers insight into how the city handles alternative roofing materials and limits on architectural salvage enforcement.

10:55-24:01

227 M Street - Fiberglass Front Door Proposal

watch

The Planning Bureau recommends denial of a fiberglass door in the conspicuous touch zone directly facing the sidewalk. The applicant offers a style compromise (moving from a half-glass door to a solid six-panel door), leading the Board to consider paintable composite materials.

Essential for understanding structural guidelines for properties directly bordering public sidewalks, also known as the touch zone.

24:01-39:18

308 Window Replacement & Frame Packing

watch

The Board debates approving Fibrex composite window replacements that require one inch of packing on either side of the first-floor window frame. Despite packing being traditionally discouraged, the Board approves it as a better visual alternative to a flat picture window.

Illustrates how the Board weighs structural compromises against aesthetic and historic preservation guidelines.

39:18-52:24

Broad Street Market - Historic Profiles & Masonry

watch

Architectural teams present reconstruction concepts for the Broad Street Market brick building based on 1890s photos. They address exterior masonry stabilization, utility replacements, concrete floor removals, and restoring historical recessed wood-panel entry doors.

It provides critical updates on the foundational, structural, and masonry-related phases of rebuilding this local landmark.

52:24-1:01:08

Broad Street Market - Window Design & Operability

watch

The consultants review window design options for the Market. They evaluate aluminum and composite material samples, simulated divided lites, and discuss utilizing key-operated Marvin double-hung mechanisms to limit operations to market management.

Shows how architects integrate security, environmental systems, and historic window frame detailing.

1:01:08-1:09:52

Broad Street Market - Paint Palettes & Metal Roof

watch

Architects outline the historic color palette derived from paint-chip analysis. They present plans to shift the roof design to a highly durable, 35-year standing seam metal layout, which mirrors historical market buildings of the same era.

Explains key material alterations that double the upfront roof budget but significantly extend durability.

1:09:52-1:18:36

Broad Street Market - Site Layout & Public Feedback

watch

Review of the exterior site footprint, including placing HVAC chiller systems in the adjacent parking lot to hide them from view. Public commentators express strong support for the architects' deep research and historical accuracy.

Shows how mechanical systems are integrated discreetly and showcases the community support for the current design plans.

1:18:36-1:25:09

Broad Street Market - Law Bureau & Section 106

watch

The discussion covers why a formal COA was not filed, directing final designs to City Council instead. The Board discusses federal Section 106 requirements and advocates for HARB representation in the official consulting party process with SHPO.

Provides vital information regarding the legal, federal funding, and administrative processes steering the final rebuild.

Key points

  • Broad Street Market Rebuild Adopts Standing Seam Metal Roof — Architects revised their plans for the Broad Street Market brick building to incorporate a standing seam metal roof based on historical precedents from 1872. Despite doubling the upfront material cost, it offers 35 years of color-fading resistance and aligns with SHPO preferences.
  • Window Packing Frame Compromise as the Lesser of Two Evils — The Board approved the installation of composite Fibrex windows at 308 despite the requirement to pack out the first-floor window frame by one inch on each side. The alternative—flat picture windows with mock rails—was deemed visually inferior to retaining active, double-hung sashes with offset check rails.
  • Strict Standards in the Conspicuous Touch Zone — Proposed fiberglass doors placed directly against public sidewalks (the 'touch zone') face intense scrutiny because alternative materials are highly conspicuous there. However, the Board showed flexibility when the applicant compromised on style, shifting from a half-view glass door to a solid six-panel design.
  • Triggering Federal Section 106 Review for Market Funding — Because federal funding is tied to the Broad Street Market reconstruction, a Section 106 review is triggered, necessitating consultation with interested parties. Board members emphasized the importance of officially designating a HARB representative (specifically the Board President) to participate.
The project is similar to other approved proposals for replacement of real estate shingles and thus there is precedent for the allowance of the alternative materials and the project involves replacement of architectural elements with minimal visibility. Jeffrey
I do always inform everybody that board decisions are not precedential. They're based on the circumstances of each particular property and each particular project. Jeffrey

AI-generated from the transcript. May contain errors.

5:21

Mrs. Gripple,

5:23

Miss Rucker, Miss Bennett here, and Mr.

5:26

Henry.

5:38

Um, so we'll start with new business.

5:41

The first on the agenda is 210 Hamilton

5:43

Street.

5:54

If you would

5:57

address name is Chris, address 340

6:00

Pleasant Road, PA7.

6:05

Great. Thank you. Um, first we'll start

6:07

by Jeffrey reading a synopsis.

6:12

Uh, yes. So, the applicant is proposing

6:14

to replace the existing real slate

6:16

shingles on the third floor maner roof

6:18

and dorma roofs with Ecostar synthetic

6:21

slate shingles. Um and uh if uh you've

6:24

seen the photos in the uh case report or

6:27

um did a site visit to the property, uh

6:30

you'd note that uh the there is a pretty

6:33

minimally visible maned roof on the

6:35

third floor of the front of the

6:36

building. Um and uh they'll be replacing

6:40

the slate shingles there uh and on the

6:43

um kind of large A-frame dormer there uh

6:46

with the Ecostar uh synthetic slate

6:50

shingles. Um this is a product that uh

6:52

has been reviewed and approved by the uh

6:55

board before. Um so uh this is not

6:59

proposing a new product. Um and uh the

7:03

uh visibility of the location of work is

7:05

pretty minimal. Um and so it's a pretty

7:09

straightforward uh proposal. Um the

7:12

planning bureau staff is recommending

7:14

the request be approved with the

7:16

following conditions. Uh the applicant

7:18

should utilize a similar slate color to

7:20

the existing shingles. Uh and that's

7:22

just kind of to to maintain the overall

7:25

general appearance of the property. Uh

7:27

and then uh planning bureau staff

7:29

recommends our quest be approved for the

7:30

following reasons. The project is

7:32

similar to other approved proposals for

7:33

replacement of real estate shingles and

7:35

thus there is precedent for the

7:36

allowance of the alternative materials

7:38

and the project involves replacement of

7:40

architectural elements with minimal

7:42

visibility and a low profile along the

7:44

mansered roof.

7:49

open

7:50

the meeting up to you if you have more

7:53

comments.

7:55

No, the only thing I would not is that

7:57

we'd be using the fish scale ecoar which

7:59

would mimic exactly what's on on the

8:01

manor wall at the

8:03

time basically identif going over there.

8:14

Yeah,

8:15

would be a similar color, but

8:19

we'll match it up as well as possible. I

8:21

believe it's going to be a bedroom.

8:26

Yeah, those two. We're going to hold it

8:28

up. Double check.

8:31

Now, was that painted that slate painted

8:33

with that u

8:35

No, kind of looks like it in the photo

8:37

that it might have. Yeah, that's on

8:45

and um do you know if it was reviewed as

8:50

possible salvage?

8:53

It's beyond repair. So, fortunately,

9:00

I know sometimes we've asked the owners

9:02

to

9:14

Uh I mean I think there's been

9:16

discussion of that. Uh but I don't know

9:18

that you know the city uh manages like

9:21

an architectural salvage operation or

9:24

even a facility where this stuff could

9:25

be suh stored and then um you know

9:28

resold. Uh so I don't know, you know,

9:32

how we would maybe mandate that or track

9:35

that. Uh obviously it would be

9:36

preferable to retain whatever shingles

9:39

are possible for use, you know, on any

9:42

historic building, preferably in the

9:44

city, but um just because really there's

9:46

not a whole lot of like new slate

9:48

shingles being made uh nowadays. But I

9:51

think at the end of the day, um you

9:53

know, having a requirement like that or

9:54

a condition like that is just you know,

9:57

maybe difficult to enforce.

10:00

We do actually save when we can because

10:03

I get for other slate repairs. I do some

10:05

of that as well. So now I don't know

10:09

city would want

10:11

take them off and I can save 100 tiles.

10:13

I actually

10:19

that's what we would like to do.

10:24

Um any other comments from the board

10:26

questions?

10:32

Um I have a question for the board. Do

10:35

we want to change the condition

10:37

or say that the shall utilize a similar

10:41

slate

10:42

color

10:47

shape size and shape or texture maybe

10:51

would be a better

10:53

Yeah.

11:00

I

11:03

guess I don't know if you can get a

11:05

similar texture.

11:08

Well, I think as opposed to like it's

11:10

Yeah, the rough edge kind of

11:22

looks like a fiship.

11:28

I don't think it has a particular name

11:30

for it. I think Ecoar and Da Vinci both

11:32

come that way

11:34

naturally. Have that type edge. They

11:37

don't finish an edge of slate in one way

11:40

or the other. That makes sense.

11:47

And I guess I'll make a

11:50

motion modified condition. Second it.

11:56

I

12:15

oppos. Right. Next on the agenda is 227

12:18

M

12:20

Street.

12:21

Sorry. Absolutely.

12:36

I was going to say absolutely not. That

12:38

is not what that says.

12:41

Is that really how it's how it's

12:44

pronounced years without

13:03

Stephanie Anders.

13:14

Uh yes. So the applicant is proposing to

13:16

replace the existing panled front door.

13:18

uh and transom with a halfu fiberglass

13:20

door featuring panels along with the

13:22

transom. Uh so uh this proposal um you

13:27

know is similar to uh some other

13:30

proposals we've gotten in the past uh

13:32

for replacement uh of doors. Sometimes

13:35

people want to remove like a wood door

13:37

with a half view pane and just put

13:39

something solid in for security reasons.

13:40

And other times we get proposals uh like

13:43

this where it's replacing a solid panel

13:45

door um with uh half pain. Um, and when

13:50

reviewing a project of this of this

13:51

nature, you know, you kind of look to

13:53

the historic district design guidelines,

13:56

uh, which generally discourage the

13:57

replacement of, uh, panled wooden doors

14:00

with, um, fiberglass or modern

14:03

materials, uh, because the profile of

14:06

the of the panels and the recessed areas

14:08

isn't quite the same. And in this case,

14:10

we're adding a um, uh, halfview pane as

14:13

well. Um I think when I uh went out and

14:16

did a site visit um you know I noted

14:19

that uh in addition to like this

14:22

proposal and this aspect is not um

14:24

relevant maybe necessarily to this

14:26

particular project and it's not

14:28

certainly the applicant's responsibility

14:30

but it appears that a previous owner uh

14:32

replaced some of the u windows on the

14:35

property uh took two over two windows

14:37

out and put in one over one windows. Uh

14:40

there were some other aspects uh like uh

14:42

mini split system put in um and some

14:45

other changes to the building that uh

14:46

you know didn't go through uh the harb

14:49

approval or as far as I can tell get

14:51

city uh permits. Um and so you know when

14:54

looking at this I'm looking at it almost

14:56

as a continuation of that where the um

14:58

historic nature of this building has um

15:01

kind of slowly been uh degraded uh and

15:03

erased. And so I think this uh proposal

15:06

would be kind of a step in that similar

15:08

direction. Um, and you know, there are

15:12

um existing products out there like

15:14

wooden doors, wooden panel doors

15:16

especially, uh, that could be used to

15:18

replace this. Um, you know, I think

15:20

it's, you know, evident as wood door

15:21

when you go up to it. You can kind of

15:23

see some peeling paint. Um, but the, uh,

15:25

proposed door would be a pretty

15:27

significant change, uh, from the current

15:29

appearance. And again, because it's

15:31

right up against the sidewalk and is not

15:33

set back like underneath a porch or

15:35

something like that, it's even more

15:36

conspicuous than it might otherwise be.

15:38

Um so for that reason um the uh plan

15:42

bureau is recommending the request be

15:43

denied um uh because the proposal to

15:46

replace a paneled wooden door with a

15:48

fiberglass door with a half view pane is

15:50

not an appropriate or necessary

15:51

alteration to an existing historically

15:53

appropriate feature. Uh because the

15:55

building does not have a front porch to

15:56

obscure the proposed change and the

15:58

location of work is in the touch zone.

15:59

The alteration will be conspicuous and

16:01

visible from the public right ofway. And

16:03

the applicant has the option of

16:04

installing a new wooden or wood

16:06

composite panel door if the existing

16:08

door requires replacement for either

16:09

security or energy efficiency reasons.

16:17

There

16:23

anything if I may. So um the homeowners

16:27

actually

16:29

Okay. With replacing the door and

16:32

currently it would have glass and just

16:35

go back to the six panel door as you

16:38

have with regards to the the previous

16:41

steps that previous owner have

16:44

done something

16:46

she

16:47

did. Uh the only thing that I would like

16:50

to bring

16:54

up safety

16:56

and obviously contacted us for the

16:59

purpose of getting this done because

17:02

safety not to say anything we know about

17:04

that block or that part of the city but

17:07

things can happen and being a single

17:09

homeowner that is so we have to go in

17:13

full battle just the way it appears I

17:17

believe

17:18

that we are all to do

17:35

Um, I noticed that there's three doors.

17:38

Yes, two of them would be on the side.

17:41

So, it would not

17:43

have an

17:45

effect any type of

17:47

appearance. The front were actually

17:50

instead of Six panel solid.

18:10

Is there some reason why given that you

18:13

wouldn't be doing the door you had in

18:15

mind, you couldn't just keep the

18:17

original door or the existing

18:21

It

18:25

is obviously from

18:28

shifting by

18:35

and a new door would have equal

18:41

preference. Yes.

19:01

So the six panel that you're talking

19:05

so it is fiberglass but the the outside

19:09

would be of what would be a composite.

19:11

So if we

19:16

have the necessity for

19:19

that office

19:38

again right

19:45

measure. We actually uh had one of our

19:48

measures come out

20:03

city

20:04

door. So we are in all all steps.

20:09

We are

20:24

meeting

20:26

thoughts they go with this fiberglass

20:29

with the positive exterior.

20:32

Yeah. Uh you know I saw that in the um

20:35

in the case documentation that I think

20:38

there's like fiber core and then a

20:40

fiberglass outside of uh the um on the

20:44

exterior of the door. Uh I know the the

20:47

the board has approved fiberglass doors

20:50

in the past. Um I think in some cases

20:53

the conditions are a little or the

20:55

circumstances of the property are a

20:57

little bit different. Maybe you have a

20:59

you know existing vinyl door or existing

21:01

fiberglass door or something like that.

21:04

um or it's a particular size uh and it

21:06

needs to um have that you know ideally

21:09

it would be um you know wood door but I

21:12

think if there's a compromise to be made

21:14

and it sounds like the applicants are

21:16

you know willing to compromise on the

21:18

design of it I think um there's some

21:20

justification for um you know an

21:23

allowance of the material I I think in

21:25

the past

21:27

um I don't know whether it's uh this um

21:30

manufacturer or installer or it was

21:32

another one but They said that the

21:34

fiberglass was paintable. Um, so I don't

21:36

know if if yours is or not. So it is

21:38

paintable, which I know is one of the,

21:40

you know, long-standing

21:42

um, you know, issues of of every review

21:45

that the board does is the paintability

21:46

of of the product. And if the product's

21:48

paintable, um, I think there's, um, you

21:51

know, that certainly helps, uh, in

21:53

support of the applicant's position.

22:00

Does Anderson do a wood composite door?

22:04

What we have is what we are proposing

22:07

here that not a full the door itself.

22:11

It's not a posit.

22:15

Can you make it?

22:21

Currently we are not offer

22:27

approved in several areas of the city.

22:46

So that's exactly what you're what

22:48

you're looking at here. That's what we

22:49

would evidence. That's what he has.

23:22

Best framing to

23:38

those. The door be the

23:51

six. Hi

24:00

Thank you. Thank you.

24:25

Next on the agenda is 308.

24:42

Your name and address.

24:45

by

24:46

26 car.

24:56

Uh yes. So the applicant is proposing to

24:59

replace the five existing wooden windows

25:01

on the front elevation uh with fibrics

25:03

with fibbrric windows. Uh and uh the

25:06

request should I guess be modified to

25:09

note that only the first floor window uh

25:10

would be packed out um by one inch on

25:13

either side. Uh as noted in the applic

25:16

as noted in the application uh the

25:18

existing the other four windows on the

25:20

second and third floors I think would

25:21

just uh be matching existing profile of

25:24

the window. Um so in looking at

25:26

something like this I know um

25:30

the board has generally discouraged uh

25:34

packing out uh it changes the appearance

25:36

and the kind of the profile of the

25:38

window. Um in this case I think we were

25:42

balancing a couple things. So, one of

25:45

the things uh was that the applicants

25:48

noted their only this is they couldn't

25:51

make a product that was the same size as

25:53

the existing uh window frame. Um so that

25:56

would mean that the alternative would be

25:59

doing like a play glass window. Um so I

26:01

have something similar in my front um

26:04

the front window on my first floor uh

26:06

where replaced a big double hung with a

26:08

a picture window. Um and maybe you could

26:10

put you know a fake check rail in the

26:12

middle of that. um to replicate the

26:15

appearance of a double hung window.

26:18

Um or the alternative would be, you

26:21

know, allowing the applicant to uh

26:23

install the window as proposed. And I

26:26

noted that in looking at the window, the

26:28

check rail is actually somewhat

26:29

offcentered uh on the overall window

26:31

frame. And the proposed window uh also

26:34

has that offset to the check rails. So

26:37

uh you know, this is kind of um one that

26:39

I think could go either way. Um and when

26:42

considering it, I really thought that um

26:46

maybe the

26:47

greater contributo element I guess uh

26:50

would be the offset check rail as

26:52

opposed to the overall you know profile

26:54

sides of the window. Uh and so the

26:57

question came down to well we recommend

26:59

denial or a condition with approval with

27:01

a different type of window. What would

27:02

that be? Um, and again, it couldn't be a

27:05

fiber window um or a wood composite

27:08

window of the exact same size. It would

27:10

have to be a picture window with like a

27:13

a simulated uh check rail in it. Uh or

27:15

it could be what the applicants are

27:17

proposing. And so, uh while I know that

27:19

I know the board's position on uh

27:21

packing out windows, um it seemed in

27:24

this case like it may be the lesser of

27:26

two evils uh when it comes to the uh

27:29

replacement of these windows. And

27:31

obviously as they're replacing the

27:32

windows on the upper floors too, you

27:34

kind of want a continual appearance um

27:37

between all the windows on the property.

27:39

So it'd be one where I don't know that

27:42

it would necessarily be the best idea to

27:45

say, well, we'll approve the four

27:47

windows on the second and third floor

27:48

and not the first floor window. I think

27:50

that would be even more conspicuous than

27:52

um you know what some of the other

27:55

options would be. Um so uh with that

27:58

being said uh the planning bureau

28:00

recommended uh the request be approved

28:04

um for uh the following reasons. Uh the

28:07

proposed window material is

28:08

administratively approvable per the

28:10

historic district design guidelines. And

28:12

although the project represents an

28:13

alteration which is discouraged by the

28:15

board due to the visible impact on the

28:16

architectural feature, the alternative

28:18

of a picture window would be a more

28:19

conspicuous change. Um, aside from the

28:21

proposed f first floor replacement

28:23

window, the project can otherwise be

28:24

administratively approved as presented.

28:26

Uh, and finally, the project will

28:28

replicate the off-centered check rail

28:29

between the top and bottom sashes of the

28:31

existing window. Um, so again, I think,

28:35

you know, this could have really gone

28:36

either way and I'm sure there may be,

28:38

you know, some indecision on behalf of

28:41

the board members on which way to go in

28:43

this case, but um, the planning bureau

28:45

felt that this was a pre more preferable

28:48

option to the alternative of a picture

28:50

window with the simulated check rail.

28:57

Um, we can make a picture window the

29:01

correct size. What we were trying to do

29:04

was match the double hung on the house

29:06

that's attached to it, like within

29:09

inches of that window. There's another

29:11

one on the next home. So, the homeowner,

29:14

we wanted to try to keep that. We

29:15

figured that was going to be an easier

29:18

approval process than going to a picture

29:20

window. So the the it's the overall

29:24

United that window that's giving us an

29:26

issue. It's the same thing when we did

29:28

the window at your home. We're talking

29:31

about a thumbs width on each side. Um

29:34

and on a 50inch wide window that's going

29:37

to be harder to pick up on than if we

29:41

make a picture window with like a

29:42

simulated check rail. I think that that

29:44

will look worse than like sash, you

29:48

know, because it's just a piece of glass

29:50

at that point.

29:52

where the sashes aren't offset and that.

29:54

So, the double home's going to look much

29:56

better as you're driving by, then you

29:59

won't you would have a really hard time

30:01

noticing one inch on each side of that

30:04

window

30:05

with it.

30:09

Can you explain the one inch uh

30:13

so I can make No, I can make it would be

30:17

on the width. So, I can make the width,

30:19

but then I can't get the height. I can

30:21

make the height, but then I can't quite

30:23

get the width. So, we're like two inches

30:26

too big on the the overall size of that

30:30

opening. So, it was going to look better

30:34

uh because we can slope the sills on our

30:36

double hungs to match the slope sills of

30:38

the original windows, it was going to

30:39

look better to lose the inch on the

30:42

sides than at the top and

30:46

bottom. We can nicer that way. And then

30:49

on the interior, it has the existing

30:52

original wood stops. They almost cover

30:56

most of that packing and we're just

30:58

going to have a little bit on the the

31:00

inside to touch up on. So, but it'll

31:02

look much better with the double hung

31:04

being out front. So, you're there's

31:07

brick walls around.

31:10

Um, again, that's all staying original.

31:13

So, the homeowner, he travels a lot for

31:15

work. He knows that he needs there's

31:17

some uh wood work that needs to be done

31:19

and like the box sills and whatnot. He's

31:22

going to paint that to match because our

31:24

color is pretty close and he's going to

31:26

paint the wood trim around to match the

31:29

window once he gets the wood repair

31:31

done.

31:34

And then what is the full exposure of

31:36

the sash?

31:37

I don't know. The size of the width of

31:40

the sash

31:42

the overall unit is going to be The

31:45

overall unit width is 48 in wide is what

31:48

we can make. You go into that opening. I

31:52

would say 3 in from there to start the

31:55

glass. I don't know. The sash

31:57

is 2 in wide the whole way around. It's

32:00

very accurate. So, so like original wood

32:03

windows. Okay. But so it look like two

32:06

inches on the top, three inches on the

32:08

sides, two inch. Oh, is it you're

32:12

talking about the border around the

32:13

window. I don't think you're because

32:16

there's box sills below it. So, that's

32:20

going to blend in nicer. Um, and then at

32:22

the top there's more than likely

32:23

decorative trim um around that window.

32:27

So I don't think if you're are you

32:29

talking about like the

32:30

profile around the window where we

32:32

finish off

32:34

to that we'll

32:37

be our window is 3 in from frame to

32:41

glass and then we're going to have about

32:43

an inch on each side. So you'll have

32:46

um probably

32:51

only two inches of like finishing

32:54

material from our window over to the

32:56

existing trim and then the rest will be

32:58

window sash like sashes

33:01

operating that what you were looking for

33:04

each side or I guess I'm confused on

33:06

what your question was that two inch on

33:09

each side or one inch each it's one inch

33:11

on each side but then the finishing

33:13

covers support our window frame. So,

33:15

that's where I got, you know, you're

33:16

going to we're going to use what we

33:18

typically use in Harrisburg is um called

33:21

Ftrim or Ltrim and it's made out of the

33:23

fiber material. Um you'll probably have

33:26

about a 2 inch wide piece of that

33:28

running around, but it's covering up a

33:30

portion of our frame. It's covering up

33:32

the whole window frame. It snaps into

33:35

that. You want to see some pictures of

33:38

like of like before and afters or

33:43

I don't have them of that house, but I

33:45

have

33:47

Is this material?

33:50

Yeah, it's we've been using

33:52

it in Harrisy here

33:56

for 10 years, I think. Yeah, I was going

33:59

to say I think the first couple

34:01

instances we had were maybe like 2014,

34:04

2015, and I think there had been

34:06

administrative approval starting like

34:08

2016, 2017 or something. I think was

34:10

when the board took a vote to grant

34:13

administrative approval to it.

34:20

I understand the description.

34:26

Thank you.

34:28

Um I you know I I think to um you know

34:32

the applicant's uh point because it's

34:36

not just a simple brick mold frame all

34:38

the way around uh and kind of to your

34:40

point of like well it would be two

34:41

inches on the top then and three inches

34:43

on the side because you have those like

34:44

chunkier headers and sills. Uh the

34:48

additional width on the sides is going

34:52

to be less noticeable because of those

34:53

bigger blocks on the on the top and

34:56

bottom of the window. If it were just,

34:57

you know, brick mold all the way around

34:59

and you just like put a window in there,

35:00

which we have those windows in in the

35:02

city, um I think it would probably the

35:05

change would be more evident. Um but I

35:07

think due to the nature of the um

35:09

existing uh conditions, I think it'll be

35:12

less visible and and I think like I

35:15

said, at the end of the day, it seems to

35:17

me that the more you know, unique aspect

35:19

is the offset check rail in this window.

35:22

Um, and

35:23

so a replacement that can replicate that

35:26

is probably preferable over something

35:29

that's just again a picture.

35:33

Find an image that you share with I have

35:36

a a few um you want to bring it up.

35:47

So this is cornal but like same age,

35:51

right? But we did bottom two windows,

35:54

top three are still original.

35:57

And this is packed out with the one.

35:59

These didn't necessarily need to be

36:00

packed out, but there's not a whole lot

36:03

of difference. And these are much

36:06

smaller windows. So on a 50-inch wide

36:08

window, that's that's the issue. We're

36:10

talking about a thumb on each side. And

36:15

you there's going to width difference

36:17

between this window and this window just

36:19

because you're setting inside the

36:21

existing framing that's already

36:37

there right side windows

36:40

original left side replacements

36:45

So there's like some slight profile

36:48

differences, but driving past and seeing

36:50

that is going to be much harder to see

36:53

than if we put

36:55

the a 2 in wider picture window

37:00

in cuz the homeowner was trying to match

37:03

the window that's like 2 feet over in

37:05

the neighbor's home.

37:10

Yeah.

37:13

It's very very close.

37:18

[Music]

37:19

Thoughts, concerns?

37:26

I like the idea of keeping an operable

37:28

window operable.

37:34

I would

37:36

suggest

37:38

that at least from my perspective I

37:40

would be okay with approving this but

37:42

not having it set the precedent that

37:45

this would be a one time only approval

37:47

for this

37:49

particular alteration

37:54

that month from now someone says well

37:57

they did

38:01

view each one of

38:04

and I and I do always um you know inform

38:08

everybody that uh that board decisions

38:11

are not presidential. They're based on

38:14

the circumstances of each particular

38:16

property and each particular project. Um

38:18

and therefore approval of a particular

38:21

material or product for one property is

38:23

not necessarily going to be given for

38:24

another. again, if you're have a door

38:26

right up to the sidewalk or step back on

38:28

a in a in a porch. Um, so I do make a

38:31

note of that, but including it in the

38:33

actual uh resolution is, you know,

38:36

probably helpful to anybody that may

38:38

want to read that for the future.

38:48

[Music]

38:52

Motion. I make a motion to approve

38:56

with

38:57

Connie's recommend with the addition.

39:00

Okay. Second.

39:04

I have a

39:10

motion.

39:11

Second.

39:15

I motion carries. Thank you very much.

39:38

other

39:40

business continue what was discussed

39:42

last

39:44

month of the project.

39:50

your name and address.

40:00

Yeah, I gave you I gave you the

40:02

PowerPoint, the print out. I actually

40:04

have um the specifics on the paint and

40:06

the masonry I think from last meeting

40:08

too, just in case you had follow

40:10

questions about that. But the PowerPoint

40:12

that you have is the one um that they

40:14

had provided for this meeting. I think

40:19

photographs in there because it was too

40:21

low resolution.

40:39

Peter from 6608 North place

40:44

Rebecca

40:45

McCormick

40:47

West Market Street.

40:59

Um, you know, not much additional beyond

41:02

uh last month's discussion. Um, we did

41:04

have a a follow-up meeting where we

41:06

discussed some of the feedback that the

41:08

board provided at last month's meeting.

41:11

um and some maybe additional uh

41:14

information that the consultant team may

41:16

want to provide uh for this particular

41:20

uh presentation. And if you'll note on I

41:23

guess the seventh page of the um

41:26

PowerPoint uh they have a kind of

41:28

comparison chart of the um materials uh

41:33

that are involved in this uh

41:34

reconstruction. some of the major

41:36

materials that are involved in the

41:37

reconstruction. Um, you know, roof,

41:39

walls, windows, uh, doors, and it kind

41:42

of has a breakdown of what it was

41:45

originally, if known. Um, what might

41:48

have happened or what happened in the

41:49

1970s when there was a reconstruction

41:52

project and then in the '9s during that

41:54

reconstruction project, which we

41:55

discussed at the last meeting, and then

41:57

finally this current proposal. So, I

41:59

think it it's designed to uh help the

42:02

public and the board understand and kind

42:04

of track like what's being changed. Is

42:07

this a change from the original or is

42:09

this a change from the most recent

42:11

reconstruction of the of the property?

42:14

And therefore, it might be different

42:16

from what we are used to seeing as

42:18

residents of the city. Uh but that's not

42:20

necessarily means it's any less historic

42:22

or less appropriate uh than what was

42:25

there previously. Uh so that's what that

42:27

charter is designed to do. Um and I

42:29

think uh the consultant team will um

42:32

probably expand a little bit upon that

42:34

and um maybe address some of the other

42:37

uh questions or issues that were brought

42:39

up by the board at the last meeting.

42:43

I just want to make one clarification. I

42:45

didn't say I just said it was the Broad

42:47

Street Market, but focus is the brick

42:50

building today. There might be comments

42:54

on other

43:01

discussion. So,

43:03

um guess go through your PowerPoint with

43:06

us.

43:10

Um so, I'll start with uh page two. Um

43:14

it's some of the photos that were

43:17

previously presented at the last

43:19

meeting. Um again, these are the photos

43:21

we've been in our research um using as

43:25

um items or checkpoints to go back into

43:29

try to tell the story of what was

43:30

previously there and how the building

43:33

time

43:38

um some historical photos. The one note

43:41

on the right is the is the structure

43:43

that was previously in the plaza and

43:45

building

43:47

um the

44:05

dark is also some more um images. Um

44:12

really focused

44:14

on the image on um we did reach out to

44:20

um for some more as

44:24

well that he sent back to us. Um did

44:28

learn this image is from 1890.

44:42

So like Jeffrey was just saying we did

44:45

compile a chart to uh sort of explain

44:48

the evolution of various elements of the

44:51

building and what we're proposing and in

44:53

a lot of the cases we are going back to

44:57

the what is the original um because in

45:01

the 70s they they made some some very

45:04

drastic changes um and then again in the

45:07

'9s Some of those changes went back to

45:10

the original and others did not. So we

45:12

are trying to reference the 1890s image

45:16

with all

45:19

modifications

45:22

windows. We'll get to the roof as well

45:25

because there's some changes

45:32

from the next

45:37

much has changed since the last uh the

45:39

last

45:40

meeting existing walls are two widths um

45:44

with space in between. Um and usually uh

45:50

bricks every seven to kind of help tie

45:52

it together. Um but it needs some

45:56

stabilization to graph of the center

45:59

void um and point to an exterior size

46:04

wall and also metal stuff on the

46:07

interior side um to stabilize the wall

46:10

as well.

46:16

It's some other

46:18

um issues that we discovered some of the

46:24

bricks are very

46:27

soft

46:29

to place the select bricks if they're

46:32

really bad shape ways to possibly

46:45

It

46:51

stands a water

46:54

issue

46:56

of that

47:05

We didn't find out what the um issue

47:08

was. So they weren't able to actually

47:10

scope the the down spout. So we're going

47:12

to actually part of the project we're

47:14

going to replace all the down spouts and

47:16

underground basically. So that was one

47:19

of the problems where we um we are

47:23

trying to get more information from the

47:25

geo with the water table. water tables

47:28

roughly 10 ft low rate which should be

47:31

below us but there's still concerns

47:33

possibly we have a a wet season that it

47:37

might rise up for for small periods of

47:40

time so we're still looking at

47:43

waterproofing the existing

47:47

we are I think we talked about this last

47:49

time we're removing the slab inside so

47:52

we can get to the foundations for

47:54

repairs from the inside and Basically

47:57

all of the sidewalk along the north and

47:59

south side will be coming out for

48:01

replacement of infrastructure and

48:04

utilities and

48:06

um a foundation drain will also help

48:10

drainage so if it does rise can drain

48:14

doesn't get absorbed.

48:25

No we're fill the cavity. So, we're

48:27

going to put a

48:52

mebring section. That's the section

48:54

that's out.

49:04

as well. We're all on the same page.

49:10

So, it's

49:12

it's on the following slide.

49:30

interior elevation showing

49:34

some

49:45

construction last

50:02

Next slide is our

50:12

photo is an example of um the door

50:17

replacement and

50:25

transmosing as we did last month to take

50:29

the trans up to

50:33

height

50:41

larger. Next slide.

50:53

They were solid panel.

50:59

There was there's glass inserts current

51:01

like prior to our project. This is the

51:05

'9s replacement doors which were not

51:08

authentic. Didn't look like it did. So

51:11

we're going back. We're going to go back

51:12

to the solid

51:15

on the

51:16

exterior east and west elevations.

51:19

There's a six that was used in photo and

51:23

then on the the east I mean north and

51:26

south

51:29

elevation lower eleing

51:49

to have the interior set of the

51:56

doors that way. Um the other thing too

52:00

is originally the doors were out.

52:04

Um you can kind of see that door slide

52:08

that I referenced. There's kind of a

52:11

recess for the doors that we're going to

52:14

have that as well. That's more

52:28

and west entrances will have 88 push

52:31

buttons. So,

52:40

thank you.

52:46

The next slide on slide 17 is

52:49

just it's the

53:05

photo. So this slide that has

53:09

various images is just showing it's just

53:13

illustrating the changes that were made.

53:16

So in the 70s they actually broke the

53:19

transoms into two separate pieces. The

53:21

lower piece of the transom was operable.

53:25

The upper piece was fixed and they

53:27

actually recessed the lower transm with

53:30

the door. Um and then in the 90s

53:33

renovation they they tried to go back

53:37

to historically but I still think they

53:40

didn't

53:41

quite make it match. Um so You can just

53:46

see the evolution rightosing what we

53:48

feel is the closest match how it

53:59

wasn't getting to windows.

54:02

Um we are looking at the bigger windows

54:05

and also taking

54:08

those back historically. So in this

54:12

photo um the

54:20

199 we're working with to do um a

54:24

different

54:25

size middle windows because we think

54:28

originally they probably didn't they

54:30

weren't able to manufacture or install

54:33

the

54:34

window because it is so large. So the

54:37

middle mountain will be a wider

54:39

profile to mimic the original

54:45

today because we do want to continue the

54:48

conversation of the aluminum windows. We

54:51

also brought a sample of a composite

54:54

window. Um we have learned from that

54:59

they cannot manufacture the first

55:17

extruded like you

55:21

can. So this obviously exact window

55:26

we're proposing but we wanted to show

55:30

materiality we talked a bit about the

55:34

simulated divided lakes. Um so this is

55:38

what this is

55:41

78 for the

55:44

month and the the divider piece will

55:48

be doesn't

55:51

light this one shows that metal finish

55:55

and you can see it more because it

55:58

reflects light but these are the

56:00

composite windows and you can see the

56:02

the lines are just not as crisp and

56:04

clean.

56:13

We have some details in the next sheets

56:16

that show we've been studying all of the

56:19

we don't have any original

56:21

windows but we

56:24

are windows there which

56:29

presumably to the original windows but

56:32

also just the proportions and the

56:35

We

56:52

check which

56:58

is the way to go with you know be

57:02

finished with the

57:06

[Music]

57:13

That's the reason behind it.

57:30

I am

57:46

here nowing a fully operable double

57:50

double hung windows. Um so Marvin has a

57:54

hardware that they can lock the

57:59

So it can only be operated with key

58:01

which means it can still be operated but

58:03

somebody could just

58:07

you need to ventilation that's

58:12

well the building will be climate

58:13

controlled though that's the thing like

58:15

you probably we probably don't want

58:16

people opening the windows um when the

58:19

AC's on or the heat's

58:21

on they make the air go they

58:28

And well, in the

58:36

event and open the

58:38

windows, we're

58:40

noting

58:44

any screens. It really would interfere

58:48

with the appearance.

58:54

So the operation would only would be

58:57

very

58:59

limited not by people in the market but

59:01

only by

59:06

and that's the first one or the story as

59:10

well.

59:17

So um these details we're still

59:20

developing these details but have

59:23

met the manufacturer to discuss and

59:30

um discuss how the windows are going to

59:33

integrate into the existing building.

59:35

We're not modifying any of the

59:39

um talked about last time we are

59:42

replacing all of the sills which had

59:44

been replaced in the 90s. They don't

59:46

quite fit the openings.

59:50

So, we're proposing a

59:51

pre-cast.

1:00:01

Um, you know,

1:00:04

there were more closely, but we did all

1:00:09

the

1:00:13

details. We pulled a couple

1:00:15

of projects that were approved by the

1:00:19

register of historic places. So um the

1:00:24

um 1887 American

1:00:29

brewy similar

1:00:34

era7 that range a little bit earlier

1:00:41

but they were all custom made by

1:00:46

also and that was

1:00:49

projects on the

1:00:58

national station. So very similar era

1:01:02

um aluminum custom wood windows by were

1:01:08

approved for this project also in the

1:01:12

national like these are two that are

1:01:15

very close

1:01:17

to those

1:01:56

Uh yeah, we do right before the um

1:02:00

dimensions.

1:02:02

But

1:02:03

um I mean we did find this on

1:02:08

um on the National Park Service

1:02:10

rehabilitation guidelines uh

1:02:13

did state that for example C types of

1:02:17

large buildings particularly highrises

1:02:19

um which is not but um building room

1:02:22

windows may be suitable for historic

1:02:26

wood are not practical and the design

1:02:28

dete

1:02:41

Then question about

1:02:46

windows. We'll move on to the paint

1:02:48

analysis. I think we talked about last

1:02:50

time we did um take 23 samples from

1:02:55

various locations building for paint

1:02:57

analysis. There were only really three

1:03:00

on the exterior that were usable paint

1:03:03

samples um because there was so much

1:03:05

charring on the paint that a lot of it

1:03:07

was not usable. Um but these these are

1:03:11

the three colors that we did find

1:03:14

through paint

1:03:19

and some

1:03:23

images. We also talked a little bit last

1:03:25

time about um the

1:03:29

historic image for the pink colors going

1:03:33

away from just all white trim to

1:03:37

palette.

1:03:40

Next building is a another project we

1:03:43

did in historic

1:03:54

Gettysburg. We presented several

1:03:56

different

1:03:57

options palettes using a lot of the same

1:04:00

colors from the analysis. We presented

1:04:04

it to the the market board and the small

1:04:07

group that

1:04:08

we everyone read the option list which

1:04:12

is what we're showing

1:04:13

[Music]

1:04:20

here in a solid color whereas the doors

1:04:25

will be used by public would have a

1:04:28

two-tone palette where the base panels

1:04:31

are a lighter color the styles and rails

1:04:33

are probably darker

1:04:39

And just for clarity, where's the red

1:04:42

going? Is that on the bracket?

1:04:47

So

1:05:00

also, so we're trying to tone versus

1:05:21

two more

1:05:25

detail. I know there was some comments

1:05:27

you're

1:05:31

proposing going

1:05:50

back

1:05:53

to last year.

1:06:00

series 1300 series.

1:06:06

What's the difference in the cost? We're

1:06:08

still working on the cost. Um but we

1:06:12

think on the loan it'll it'll work

1:06:13

itself out. I think on

1:06:17

the we did we did have a meeting today

1:06:20

actually um that it would probably be

1:06:22

around double the cost um cost of it

1:06:36

mainting

1:06:46

color the details but we're trying to

1:06:49

find the smallest standing seam profile

1:06:58

updated session last

1:07:07

time. Um so the the red lines on

1:07:12

the minimally changing the pitch um we

1:07:15

need to get ination

1:07:18

um to

1:07:21

minimize we

1:07:24

understand but there's

1:07:29

ways piece that's that goes against the

1:07:34

brick better system we think there's

1:07:38

of those up to minimize the impact

1:07:43

of the facial

1:07:57

growing ground.

1:08:20

have one question. Um, in a meeting

1:08:24

recently, someone asked about the

1:08:26

brick there.

1:08:29

Were you able to manufacture?

1:08:40

We were actually taking they're removing

1:08:56

bricks. This green

1:09:02

different bricks. So the bricks are

1:09:03

different sizes exterior for the three

1:09:06

different pieces and

1:09:12

inter same.

1:09:25

All

1:09:26

right, I'm impressed.

1:09:35

Um, yeah, I guess if you wanted to go

1:09:38

through your last slide there of the

1:09:40

site, Ariel,

1:09:44

no, it was just if there was any

1:09:46

comments that we needed to talk about

1:09:47

the site, we just included,

1:09:51

what is the scope of work on the site

1:09:53

for the brick building? said you were

1:09:55

talking about taking off the concrete

1:09:58

floors to get downations but people

1:10:00

should expect

1:10:10

and for interior of

1:10:14

the building I understand the systems

1:10:19

want to kind of

1:10:21

disguise itself

1:10:24

at separate. No, that's that's starting

1:10:28

to evolve right now. Right. So there is

1:10:30

not what's being proposed right now is

1:10:33

there's not a central plan.

1:10:36

We're proposing um to put a chiller pack

1:10:39

system which would be in the parking

1:10:51

lot parking lot

1:10:58

here and then find a way to shall

1:11:07

We're exploring it now and then the

1:11:10

chillers will be fed below the

1:11:14

street and as well

1:11:19

we're never going to be

1:11:25

able to find a house for

1:11:31

now on the

1:11:34

same basically left very little.

1:11:39

down into upper

1:11:47

area. It'll be space,

1:11:53

but you won't need

1:11:54

any building.

1:12:04

You're saying

1:12:17

wall side that kind of splits it. We're

1:12:20

on the east

1:12:30

side or it' be on the first story.

1:12:33

There's a high window.

1:12:36

There's like a higher window that's

1:13:01

not members of the public

1:13:05

here. wanted to bring up to your

1:13:07

attention and we're looking

1:13:09

at specifically today. I can understand

1:13:13

that to be the first phase

1:13:17

of

1:13:20

future to this

1:13:24

project. Do you have comments you wanted

1:13:26

to

1:13:30

this procedure is name address for the

1:13:33

record?

1:13:41

I serve on the task

1:13:44

force. They meet every other Tuesday

1:13:47

with the architects and I'm very

1:13:50

impressed. I just want to say that for

1:13:52

the record. The way in which the

1:13:54

architects have approached this project

1:13:57

both with respect to being diligent with

1:13:58

historic photography, paint colors and

1:14:02

other attributes of the project. I just

1:14:05

wanted to mention that from my

1:14:06

standpoint speaking on behalf of

1:14:09

historic from my standpoint very

1:14:11

impressed. The only other question uh is

1:14:15

state historic preservation office is

1:14:17

also I think in the process of reviewing

1:14:19

these plans and whether or not there's

1:14:21

been any feedback from them and that is

1:14:24

requirement based on the federal

1:14:26

undertaking some grant funds involved

1:14:29

here that does kick in that state. So I

1:14:34

don't know Jeffrey can you comment on

1:14:36

that? Uh I don't believe I've received

1:14:38

anything yet. I don't know if the

1:14:40

project team has

1:14:42

So we we did get a preliminary uh review

1:14:45

better and it was only based off of our

1:14:48

schematic design submission. So they

1:14:50

haven't seen the development of the

1:14:51

design. So we need to have that

1:14:53

conversation with them but um they did

1:14:55

make the same comment that you guys did

1:14:57

um that their preference was for a metal

1:15:00

just we've made that change. um a couple

1:15:04

of interior

1:15:06

uh comments comments on the interior

1:15:09

building,

1:15:12

but I don't think it were really any

1:15:15

different than what we had discussed

1:15:17

with you guys last

1:15:19

month. Just in support of your metal

1:15:21

roof, which I'm really glad that you've

1:15:23

made that change.

1:15:25

I did a little research too trying to

1:15:28

find um some information and could not

1:15:31

find anything on this building in

1:15:33

historic newspapers, but there were

1:15:34

building they were building another new

1:15:38

market in 1872 on Market Street and they

1:15:42

were using a metal on that

1:16:03

But again, it would appear that the

1:16:04

state preservation office is in the

1:16:06

process of

1:16:13

What's the maintenance on a metal roof?

1:16:18

I

1:16:23

don't

1:16:37

expect color so it'll have a high

1:16:40

reflectivity and less prone to fading

1:16:43

than a darker color.

1:16:46

That's what

1:16:47

I they do paint.

1:16:51

So, do they them over paint?

1:16:56

You can't paint over

1:17:02

that for

1:17:05

the is 35 years for the finish. Oh, for

1:17:10

the finish. Okay.

1:17:12

I think there'll be some date. I

1:17:14

mean, but

1:17:18

Thank you very

1:17:36

much. Josh Kesler, city

1:17:42

res. I think these guys have done a

1:17:44

fantastic job. I came

1:17:47

tonight

1:17:51

exior but I went through the plan I

1:17:53

support you know all of it was very

1:17:58

thought on the windows very historically

1:18:00

appropriate

1:18:02

maintenance metal

1:18:04

roof touch

1:18:08

necessary so you know it's a little more

1:18:11

upfront cost first but longevity

1:18:15

you know

1:18:19

is full support of proposals any other

1:18:24

changes maneuvers or other things that

1:18:25

might come

1:18:31

up here.

1:18:49

Julia James 1327

1:18:54

Street about indoors as someone who's

1:18:57

not quite tall enough to reach the glass

1:19:00

that was

1:19:01

indoors by those

1:19:04

doors coming

1:19:06

out for people to see each other coming

1:19:08

in and out a good idea.

1:19:17

What are the steps now?

1:19:31

So I think so the um um uh formal COA

1:19:36

application is not being filed um as

1:19:38

part of this project. Uh uh which is why

1:19:41

this was introduced under other

1:19:42

business. Um that was um a

1:19:45

recommendation of the of the S's law

1:19:47

bureau. Um so uh from here I guess uh

1:19:52

the board if you have any last comments

1:19:56

that you would like to make.

1:19:58

um any statements in one way or another

1:20:03

uh to um you know express the board's

1:20:05

feelings about the particular project

1:20:07

but I believe um you know there wouldn't

1:20:11

be a formal COA uh resolution to go to

1:20:14

the to city council although city

1:20:15

council will of course be um getting uh

1:20:18

this documentation they would be voting

1:20:20

on various aspects of I'm sure contracts

1:20:23

and stuff like that uh so this will be

1:20:26

going to city council in something.

1:20:45

So I'm not sure that it it doesn't but

1:20:48

that city council is going to ultimately

1:20:51

get this right. So essentially if you

1:20:53

guys did it your step one right city

1:20:56

council it always essentially goes

1:20:58

there. So, we're just making sure that

1:21:00

you guys have any questions, comments,

1:21:02

that was the presation. That's what that

1:21:03

was

1:21:04

for. I guess it's turning on now. Um,

1:21:08

but essentially, again, as Mr. Knight

1:21:10

said, if you guys have any questions,

1:21:12

comments that you would like that

1:21:14

record, obviously, let Jeff know. It'll

1:21:16

get to city council. Um, but something

1:21:20

magnitude, right?

1:21:21

essentially that city

1:21:23

council

1:21:42

sitt first. So there's going to be

1:21:45

federal

1:21:46

funding which is why he was talking

1:21:48

about chip which means there's a section

1:21:51

106 process that you're going through

1:21:53

and so there should be

1:21:56

consultation and I'm wondering if it's

1:21:58

to have a member of the of AARB on the

1:22:02

as a consulting party there's nothing

1:22:05

nothing actually to

1:22:08

likeational front so there's nothing for

1:22:10

it to actually like action

1:22:14

I think your your comment was a little

1:22:16

different right your comment was in the

1:22:17

national review scope because they're

1:22:20

using federal funds, they have to do

1:22:24

what's called section 106 review, which

1:22:27

requires you to have consulting parties,

1:22:29

people who are interested parties to

1:22:32

attend and talk about the project. And

1:22:34

I'm wondering if shouldn't there be

1:22:37

someone from ARB on as a

1:22:43

consultant? So,

1:22:48

How is this going to happen?

1:22:51

Yeah. I'm wondering whether that city

1:22:53

question. It's interested parties. It's

1:22:56

it's not the city doesn't get to decide

1:22:58

that necessarily. We would disagree with

1:22:59

you. Yeah.

1:23:03

That's fine. We own the building. We own

1:23:05

the property. We owe the money. We have

1:23:07

the insurance files. We have the

1:23:08

applications. The city will have

1:23:10

everything to say about it. Oh. Oh, no.

1:23:13

I'm not saying the city doesn't have

1:23:14

anything to say about it. saying that a

1:23:16

consulting party isn't just a by the

1:23:19

city. I got that part. I'm saying but

1:23:21

but how it goes forward there's there's

1:23:24

many many parts to this thing but we

1:23:27

have we have an insurance company to

1:23:28

answer to at the end of the day federal

1:23:30

money what's here will be a minuscule

1:23:33

part of the entire thing which phase

1:23:35

it's in will be an issue that's still

1:23:37

not resolved. minuscule or not, if you

1:23:39

have federal funding, you have to go

1:23:41

through this consulting party

1:23:44

process. I would I would just suggest

1:23:47

that if it comes if there's an

1:23:50

opportunity that maybe president of this

1:23:52

board should be consulting part and we

1:23:56

haven't gotten to that step yet. Yeah,

1:23:58

exactly.

1:24:01

But when it when Shipo is starting that

1:24:03

read, then that's when start to come up

1:24:07

with that's when I think Trina

1:24:15

should

1:24:24

well position rather than the name.

1:24:28

Yeah. No.

1:24:33

Um, so are there comments that we want

1:24:36

to move

1:24:40

forward? The only thing that I see

1:24:50

as material

1:25:03

Yeah question last month you g a short

1:25:07

synopsis shingle and you had something

1:25:10

about the insulation build up now that

1:25:13

it's metal clad that's what I was trying

1:25:16

to trying to change the

1:25:19

profile but it's still the six

1:25:22

insulation is still going

1:25:30

because current energy

1:25:32

code installation.

1:25:38

So, we've got wood

1:25:39

doors. Made comment

1:25:42

about swing of the doors.

1:25:46

Now, just traffic. Hopefully, it will

1:25:50

again,

1:25:53

excuse me. Are there still two sets of

1:25:56

doors at each entrance?

1:26:00

There's

1:26:02

like some back of house for just

1:26:05

specific.

1:26:16

Any other concerns?

1:26:31

appreciate all

1:26:41

the use to the city

1:26:54

If there's no other

1:26:57

business to adjourn

1:27:04

Thank

Continue with YouTLDR

Analyze another video with Pro

Process a new video, search every timestamp, compare sources, and keep the result in your library.

Get Pro — $12/month30-day money-back guarantee