The Harrisburg Historic Architectural Review Board (HARB) conducted a preliminary review of the city's plan to reconstruct the fire-damaged Broad Street Market brick building. The design team presented findings from historical research and proposed structural, paint, window, and HVAC upgrades while addressing the challenges of balancing historic preservation standards with municipal maintenance costs.

This meeting highlights the complex administrative and architectural trade-offs that local governments face when rebuilding iconic public landmarks, particularly in aligning historic authenticity with modern energy codes, limited public funds, and long-term facility maintenance.

Section summaries

0:00-2:58

Meeting Call to Order and Administrative Business

skip

The meeting is called to order, roll call is taken, and the minutes from the March 3, 2025 meeting are approved. The chair notes there are no formal applications on the agenda, moving directly to 'Other Business' for a preliminary presentation.

This is purely administrative procedure with no project-specific information.

2:58-5:56

Introduction of Broad Street Market Reconstruction Preview

watch

City staff explains that this presentation is an informal, non-voting workshop to solicit feedback on the Broad Street Market brick building reconstruction. Architects Rebecca and Peter from Murphy Denton Hayer are introduced to present their preliminary research.

Provides the essential context and goals for the entire meeting.

5:56-10:23

Historic Research and Masonry Stabilization Plans

watch

The design team shares their research from the state archives and a high-resolution 1907 photo. They outline structural stabilization plans, pointing out that the tall, double-width brick walls will require internal metal studs and grout injection, and discuss replacing a water-damaged southwest corner.

Crucial for understanding the physical integrity and stabilization of the historic brick structure.

10:23-16:19

Paint Analysis and Restoring Door Proportions

watch

The architects reveal findings from paint chip samples showing the building's historic colorful trim. They outline plans to restore the exterior doors to their original, taller heights as shown in historic photos rather than the shorter dimensions present just before the fire.

Fascinating analysis of historic aesthetics and exterior spatial design changes.

16:19-20:46

Window Material Selection and HVAC Constraints

watch

The team proposes using aluminum-clad Marvin windows with simulated divided lights to match historic proportions while resisting wear. They clarify that the clearstory windows will be fixed, non-operable units due to the installation of a modern HVAC system.

Captures the most contentious debate of the meeting regarding historic window standards.

20:46-31:09

Roofing Assembly, Insulation, and Gutters

optional

The architects propose using modern architectural asphalt shingles and explain how they will taper rigid insulation at the roof's edge to preserve the historic fascia and bracket details. The board suggests researching low-slope standing seam metal roof alternatives used in similar era municipal buildings.

Technical discussion about roof contours and materials that is interesting but not the primary dispute.

31:09-41:32

Debate on Municipal Budgets vs. Strict Preservation Standards

watch

The board and city staff discuss the precedent of allowing aluminum-clad windows, balancing the high cost of custom wood windows against available insurance funding, and evaluating the city's limited capacity to regularly repaint and maintain wood units.

Highlights the direct tension between regulatory standards, public finance, and long-term asset management.

41:32-51:55

Foundation Drainage, Vapor Barriers, and Subsurface Utilities

watch

The discussion covers addressing groundwater rising up through the foundation, installing interior vapor barriers, and routing bulky electrical and HVAC equipment underground to keep the historic plaza and facade uncluttered.

Explains critical engineering choices regarding moisture control and public space aesthetics.

51:55-57:51

Phase Structuring and Meeting Adjournment

optional

The architects confirm that Phase 1 is strictly focused on rebuilding the brick building to expedite its reopening. After discussing window hardware details, the board thanks the team for their diligent research, opens the floor briefly to the public, and adjourns.

Covers final structural details and administrative wrap-up.

Key points

  • Historic Paint Color Recovery — Paint analysis of the surviving brick building fragments revealed that the structure was historically much more colorful than its pre-fire, all-white aesthetic. The architects propose moving away from monochromatic white trim and introducing historically accurate, multi-colored paint schemes inspired by contemporary structures like the Harrisburg Train Station.
  • Materiality and Maintenance: Wood vs. Aluminum Clad — The design team proposed using aluminum-clad wood windows for the reconstruction to ensure energy efficiency and reduce the city's long-term maintenance burden. However, the board voiced strong reservations, explaining that HARB standards traditionally mandate all-wood or composite windows on highly visible public facades.
  • The Historic Masonry and Vapor Barrier Paradox — Integrating a modern HVAC system requires the installation of an interior vapor barrier and insulated double-pane windows. Historic load-bearing brick walls are designed to 'breathe' and shed moisture naturally, meaning the introduction of a vapor barrier could trap condensation and lead to structural degradation if not engineered carefully.
  • Subsurface Utility Undergrounding — To preserve the visual aesthetics of the historic brick and stone facades, the architects intend to route major mechanical, electrical, and HVAC infrastructure underground beneath the central plaza rather than placing unsightly units on rooftops or exterior walls.
what we found was that um really they they were different colors and the colors changed over the years. Rebecca (Architect)
I think in the consideration of everything that's being proposed as part of this reconstruction is, you know, what's it going to cost? Because this is not a simple this is not a single home. Jeffrey (City Planning Staff / HARB Liaison)

AI-generated from the transcript. May contain errors.

1:30

All

1:36

right. Well, welcome everyone to the

1:37

April 7th historic architectural review

1:41

board. Um, our first order of business

1:44

is uh roll Mrs. Grible here, Miss

1:50

Rucker, Miss Bennett, Mr. Henry, and

1:54

Miss Ziggler.

1:57

Great. Next on the agenda is a review of

2:01

our minutes from the March 3rd, 2025

2:06

meeting. Have a chance to this

2:25

afternoon. Motion a second. All those in

2:27

favor say I. I opposed. No abstensions.

2:32

No abstensions. Motion

2:34

carries. All right. Uh we have no

2:37

applications to review today. So the

2:39

only item on the agenda is under other

2:42

business uh for a preview of some of the

2:45

work that uh will become come in a later

2:49

application for the Broad Street

2:52

Market. Um

2:54

so typical procedure is just State your

2:57

name and address for the record. You

2:59

would state your name and address.

3:16

Okay. And um usually we have a re of an

3:20

application a summary to go through but

3:23

I guess in this case we don't. So should

3:25

we just open up the floor or would you

3:27

like to stay state a few things

3:29

initially here Jeffrey? Uh yeah. So um

3:32

tonight's meeting is uh just a

3:34

preliminary presentation uh to the board

3:37

uh to um provide some uh information and

3:42

background about uh details on the

3:44

reconstruction of the brick building.

3:46

Um, and this is uh to solicit um

3:50

questions or comments from the board

3:53

members ahead of a formal presentation

3:55

at next month's meeting on uh May 5th uh

3:58

in which uh a more full uh presentation

4:02

uh and documentation uh would be

4:04

provided uh to the board. Um but they

4:07

did want to get uh again they did want

4:09

to get that feedback from the board um

4:11

in as far in advance as possible uh for

4:15

um that final uh formal uh submission.

4:19

Uh and you know we felt that because

4:22

there was no uh applications on

4:25

tonight's agenda that this would be a

4:27

good time um to uh have the board review

4:30

this uh as opposed to maybe just sending

4:33

this out via email and soliciting

4:34

feedback. Um and uh so with that being

4:38

said, we haven't provided a a formal um

4:42

case report or review of the project

4:43

because there's really not a final

4:45

formal uh proposal or review. Um and uh

4:48

with that, I guess I'll just uh turn uh

4:51

the mic over to the applicants so that

4:54

they can uh provide a little bit of

4:56

background on uh the Broad Street Market

4:58

brick building reconstruction. Sure. And

5:00

just one item, Rebecca and Peter, you

5:02

both represent Murphy Denton Hayer

5:04

Architects, right? And working for the

5:07

city on the

5:09

project. All right. Yeah. If you want to

5:11

walk us through your um PowerPoint

5:13

presentation, that would be fine. Unless

5:15

you have some intro words of wisdom for

5:18

us.

5:20

We'll we'll just dive right in. Okay. Um

5:24

Jeffrey was saying this this

5:26

presentation is focused solely on the

5:28

brick building.

5:31

scope of the project. So um we will

5:33

probably be back again at a later date

5:35

to talk about other um parts but but

5:38

right now it's just the

5:41

coping. So Pete and I have been and our

5:45

team have been doing a lot of research

5:47

um and trying to find as many historic

5:50

images as we possibly can of the brick

5:52

building um in order to be accurate to

5:56

the uh different components of the

5:58

building.

6:01

So, we've been to the state archives.

6:03

We've been to the um you know, we've

6:06

we've had some help from historic

6:07

Harrisburg. Um we've been to the

6:09

Pennsylvania State Library forum and um

6:13

gathered as many historic images as we

6:15

can. So, some of those

6:22

images. Would you mind going back to the

6:25

second page for a moment and just orient

6:27

us to what this

6:29

is showing sorry on

6:32

the the right which of those are the

6:35

exist existing buildings. So the the the

6:40

building to the right the building to

6:42

the left is the wood structure that was

6:44

uh was previously on the plaza um and

6:48

that was taken down part of the project.

6:54

So this this street is no longer

7:03

Okay, thank you. Sorry. Continue. That

7:06

that picture really is more relevant as

7:08

we develop the rest of the the big

7:11

picture stuff, but

7:13

um we did find some some good images of

7:16

the interior and exterior.

7:18

This really is the the key image that we

7:21

found and we're going to come back to it

7:23

later in the presentation because um

7:25

this is the earliest image that we could

7:28

find and we were able to get a high

7:29

resolution uh version of it. So, we've

7:32

really been studying

7:38

this side. Yes, that's the side that

7:48

So, we started uh first by looking at uh

7:50

the masonry. We have a consultant sheep

7:53

restoration that focuses on building

7:56

restoration

7:58

and things of that nature. So um see

8:02

these images here um the image to the

8:05

left is showing

8:07

that wall is two widths thick with

8:11

roughly a one inch air gap space in

8:14

between. It's a very slender wall. It's

8:17

tall. Um, so we're comfortable, um, that

8:21

we're going to be able to stabilize the

8:22

wall and use it in our new. Um, some of

8:26

the we're proposing is to have 8

8:30

in metal stud on the back side of it to

8:32

help support it and stabilize the actual

8:36

wall. We're also proposing to

8:40

uh, grout basically air to

8:45

stabilize. Um, One other thing to note

8:48

from the brick um the photo to the right

8:51

is every

8:58

seven. So these are various um images of

9:02

the grout um I mean the mortar mortar

9:05

and grout uh and there's very different

9:09

uh iterations throughout. Um we did do a

9:12

in-depth mortar uh analysis and we were

9:16

not able to

9:18

um throughout the building. Um but we

9:21

were able to understand what's currently

9:23

on the building and we're

9:26

currently finding the right permits um

9:29

for the existing brick soft softer brick

9:33

and you can tell from the bottom bright.

9:42

These are other images of other masonry

9:45

issues that we're running into. We have

9:49

um there's a water

9:51

source building. Um there's some to

9:54

attend to

10:02

um the worst area um in the nonburn

10:05

section. This is an image of the image

10:08

to the left is the interior side and the

10:10

image to the right is the exterior and

10:12

it would be the southwest corner of the

10:14

building. Um we're proposing to actually

10:18

um take down the wall roughly where the

10:22

down spout is on the leftand side and

10:25

then um right hand side of the window in

10:29

between the window and the door um

10:32

because it's not stable. It's containing

10:34

water.

10:36

for many years. You can see from the

10:38

interior side that there was like a

10:39

patch job um to try to help to help the

10:43

issue. However, it is not really helping

10:46

the issue. See on the exterior of how

10:49

it's kind of going out that condition.

10:52

Um so we really think we got to take

10:54

down that portion.

10:56

Exactly.

11:01

Um these are just some of the elevations

11:04

um working on documents outlining

11:08

work that is needed to

11:14

get

11:22

back. Um, we're also looking at the wood

11:24

accents

11:26

and document.

11:40

So, we did paint analysis on the

11:43

building as well. Um, we took along with

11:46

our consultant um, we took about 23

11:49

different paint samples for different

11:51

locations both inter exterior building.

11:54

Um, from those samples, really only

11:57

about six were usable samples because on

12:01

the building, um, there was very little

12:04

paint remaining in certain areas where

12:06

we were really hoping to get paint.

12:09

But the what the samples told us is that

12:13

um the building was a lot more colorful

12:16

than it is than it was right before the

12:19

fire where all of the accents the

12:21

windows um and all of the wood

12:23

ornamentation were paint out white. What

12:26

we found was that um really they they

12:29

were different colors and the colors

12:31

changed over the years. Um and we

12:34

started to look at the um the uh

12:37

Harrisburg train station which is of the

12:39

same era in a similar type of building

12:43

um which used a lot of these same

12:46

historic colors. So we think that's a

12:48

really good reference. Um and we are

12:51

still working through what we think

12:54

should be but we are going to suggest

12:56

some colors that aren't just white some

12:59

of the wood

13:05

This is just an example of a project

13:07

that was on in the past. Um a project in

13:11

Gettysburg historic project where again

13:14

all of the ornamentation windows um and

13:16

trim were painted out white. Um but

13:19

after paint analysis uh we learned that

13:22

really details were um few different

13:25

colors and we got everyone on board with

13:29

painting um back the original

13:32

colors that analysis told us they were

13:34

and um I think the

13:37

result

13:41

striking. We also did get three good

13:44

samples from building um again working

13:47

on what what we're going to recommend as

13:49

the paint colors, but

13:51

um we might be looking at a the exposed

13:55

deck on the interior. may suggest

13:57

painting that out a slightly darker

13:58

shade than some of the structure on the

14:01

interior.

14:09

So going back to this original

14:13

photo, some of the things we notated

14:18

in would be some of heights, the type

14:27

of built.

14:32

This is a

14:34

screenshot

14:38

right here.

14:48

are a lot taller

14:52

than we're proposing

14:55

to

14:57

to the doors back to the original

15:05

size. We did have reach out

15:08

to window

15:11

manufacturers and actually

15:18

helps us as

15:21

well. So this is just an

15:23

example. So it's a six

15:26

panel double door. This is the

15:30

center. Um so roughly previously around

15:34

prior to the

15:41

fire and the doors on the north and

15:44

south

15:52

elevations

15:54

center in the

15:56

center that

15:58

was prior to

16:02

so really it's only

16:04

short east ends where the doors

16:08

were

16:10

entry doors along the long

16:13

or

16:18

short. So, we know that windows are of

16:22

contention in a lot of cases, but um we

16:26

are again really studying and counting

16:28

bricks based off of the 197 image. And

16:33

um if you take a look at the image at

16:35

the far left, that's the historic image

16:37

in the middle. The the res the

16:40

restoration work was in the I believe

16:43

90s we really didn't keep the

16:49

proportions we would like to go

16:52

back the

16:56

grid portions that were there in 197

17:00

image we are proposing um

17:04

aluminum

17:07

interior exterior aluminum

17:12

Um, I really um think that the the

17:18

aluminum clad will preserve the

17:20

longevity of the windows and really

17:23

help, you know, alleviate some

17:26

maintenance that the city would would

17:28

otherwise have

17:29

to every five

17:32

years. All of

17:35

these and we are working um we've

17:39

reached out to a number of manufacturers

17:41

and Marvin is our preferred um

17:46

manufacturer. They

17:48

have a lot of good custom options for

17:52

matching the styles and rails and the

17:55

mountain profiles to the historic house.

17:59

Um and we are um upgrading the building

18:03

with um modern HAC system so we do meet

18:06

modern energy requirements. So that

18:09

means that we have to have insulated

18:11

windows. Um, and we are proposing

18:14

simulated lights.

18:17

I know there's been a concern in the

18:19

with the public about what simulated

18:22

divided light means. Um, and just for

18:25

clarification, um, my understanding is

18:29

there's still a wood member or an

18:32

aluminum. You're propos we'll talk about

18:34

aluminum clad in a little bit, but

18:36

there's a raised mutton bar

18:40

um on the exterior face of the two the

18:44

two panes of glass. Something on the

18:48

exterior face and on the interior face.

18:51

And then in between the two panes of

18:53

glass, there's also a divider that so

18:57

you won't see light between the exterior

19:00

and an interior piece. So I think some

19:02

people were thinking it's just an

19:04

interior piece between two panes of

19:07

glass. So you'd always get the glossy

19:09

look over the mutton pieces. Um that's

19:13

not the case with these. A simulated

19:15

divided light is to look like a true

19:18

divided light window.

19:20

We would

19:22

start on the interior and

19:25

exterior like in the bottom bottom row

19:31

second column left and then the spacer

19:35

in between so you can't

19:43

see we are

19:48

styles and um that needs to be the

19:52

proportions. It's it's challenging

19:55

because we're only using photograph. Um

19:59

we know that the windows that still

20:02

exist are not original.

20:05

So, we're working on that.

20:13

If you're done with windows, um could I

20:15

ask were the

20:17

um the um clear story windows were they

20:21

operable?

20:23

They were originally operable.

20:26

But again, since we are

20:29

um we're now going to um be introducing

20:33

HVAC into the building, um we are

20:37

proposing um fixed double window. So,

20:41

they reticable, but they not be operable

20:45

because um for one, I don't think

20:48

there's anyone at the city who's going

20:50

to be going out to opening them, but um

20:53

there's also not

21:02

long. Yeah, they work. I've been going

21:05

here since I was a child.

21:09

things to open up

21:18

this we are the manufacturers make

21:22

operable double windows but we

21:25

don't see

21:31

and and I do think it's probably

21:32

important to note that they had to open

21:34

them at that point to allow like air

21:36

flow through and the is going to be air

21:39

conditioned. There won't be that need

21:41

for that um type of you know operation

21:44

of

21:46

ceiling fans.

21:50

Uh no I don't think any

22:05

the roofing component um

22:08

1907 photo um where we don't we don't

22:12

feel that there was a metal roof um used

22:14

or slate. Um so we feel the most

22:16

appropriate is going back to the asphalt

22:18

prior to the fire um going to an

22:21

architectural typical asphalt.

22:29

And because we do have to bring the um

22:32

envelope of the building up to current

22:36

we are proposing to add

22:39

insulation of the decking.

22:42

So we what the way that we're proposing

22:46

it is to

22:49

um you're required to have continuous

22:51

insulation along the building and um so

22:55

where the roof stops at the walls where

22:58

there's an overhang we can taper the

23:00

insulation

23:02

down achieved insulation up to the wall

23:05

edge and then we can taper it down um so

23:08

that we have the same

23:11

um that existed. So from the short side

23:17

elevations

23:18

um we'll be tapering it towards the

23:21

front and the long side.

23:25

So when you're looking at it from the

23:28

endlight

23:40

and we feel that's more fitting just so

23:43

of the market having exposed decking

23:55

And then uh for gutters and down spouts.

23:57

So originally we thought before we had

23:59

the high res photo of this we thought it

24:01

was uh box gutters.

24:04

Um um but from this photo we were able

24:06

to see that it's just half

24:17

gutters. Would they have an aluminum or

24:20

copper?

24:25

I

24:30

think we also think it's hard to tell

24:33

from the image, but it looks like they

24:35

were painting. Um, and we're paint.

24:55

No, just talking here. This edge

25:06

that's pretty

25:23

You were talking about the

25:25

roof and um tapering it where it has the

25:30

overhang which makes a lot of sense

25:33

except on the end condition when you

25:35

have that facial board

25:37

still. Will you extend it upward to

25:40

compensate or

25:43

Oh, even the lower roof. Well, both I

25:48

guess the the higher peak

25:50

is more out of the view, but you still

25:54

have It looks like there's still a

25:56

facial board and some brackets, right?

25:58

So,

26:00

um compensating. Well, how how many

26:03

inches different is it?

26:07

Still working on that. Yeah, we're still

26:08

working on it, but we're trying to get a

26:11

an assembly as we

26:17

can.

26:19

So that's

26:22

insulation. We're thinking once we get

26:24

down

26:31

right on the sides on the long lengths,

26:33

but I'm talking about at the peak

26:35

there's still board there as well.

26:37

Decorative board with brackets, right?

26:39

So the roof

26:42

overhead spaces as well. So we'll we'll

26:45

be able to taper it at that

26:48

edge. So so

26:57

that good question and I guess all of

27:02

the imagery that's included in the

27:04

packet and that I've seen don't really

27:06

have an a bird's eye view. Uh So we

27:11

don't know what kind of roof was there

27:13

and if asphalt was there

27:16

last

27:18

as I'm not sure we

27:21

can make demands another type but what

27:25

do you given the age of the

27:35

building material

27:52

certainly wouldn't

28:00

I don't I don't

28:15

Yeah, I think I'd like to see some more

28:20

um typical that same age, what kind of

28:24

roofs they might have had.

28:27

Um, a metal roof to me sounds right, but

28:33

the other building that was

28:35

fair was

28:37

like

28:47

metal.

28:52

Right. The wood the wood

29:14

building a little bit.

29:21

Exit sessions

29:48

It doesn't. You can't really tell

29:50

either. We have photos from

29:55

easier to see because

30:04

it's also thought that they were

30:06

different enough that it wouldn't

30:08

necessarily matter. The other thing that

30:11

we might come up against is that if we

30:14

we do have a quite a low slope um on the

30:18

lower roof. I'm not sure that a modern

30:20

standing seam manu

30:26

Sure. Barely making jingles

30:41

there. It's you'd have to be across the

30:43

street like really like we we did some

30:46

studies actually standing if you'd be on

30:48

like the sidewalk roughly at where the

30:50

red one there's no way. Even we're

30:52

building up that you even be able to see

30:54

where it tapers

31:17

like you say.

31:24

They do make low slope metal

31:29

standings. You might want to look into

31:31

that. They don't

31:35

always there are criteria, right?

31:43

The the stone building.

31:47

That's what we were just talking about.

31:49

Um, we don't know what was on each roof

31:51

and we're just trying to find something

31:54

period appropriate

32:00

originally. That's what we're trying to

32:02

determine.

32:13

So that's that's one item of discussion.

32:17

Um,

32:19

that would be worth investigating

32:22

further for our next

32:25

gathering. Um, and then let's talk more

32:27

about the aluminum clad windows. And I

32:30

kind of see the metal roof idea helping

32:34

to justify some aluminum clad windows

32:36

eventually, but period of the building

32:39

wouldn't have had

32:42

cladding unless you can tell me

32:44

otherwise. But I don't think the age of

32:45

the building would have had aluminum and

32:48

As a board, we're typically looking at

32:53

wood or composite windows.

32:58

Um, it's very

33:01

well,

33:03

my memory doesn't I don't have many

33:06

cases in my memory of when we've

33:10

approved aluminum flat windows unless

33:13

they were

33:14

recent building. Yeah, there there have

33:17

been a couple um aluminum clad uh

33:20

windows. I think one uh that comes to

33:23

mind uh is 1718 Green Street. Uh they I

33:27

think they use the elevate uh window um

33:30

which might have been Marvin I think

33:32

does that line. Um so you know the board

33:36

now

33:37

in that case I believe that was like a

33:40

side elevation and maybe even like an

33:43

upper floor. So there might have been

33:44

the justification touch zone, not on a

33:46

primary facade. And obviously, a

33:48

building like the Broad Street Market

33:51

has many more frontages on the public

33:53

rightway. And there's also a higher

33:54

priority than a row home uh in the

33:56

middle of, you know, some block in in

33:58

old uptown. Um and and you know, this

34:02

was I did warn the project team. I said,

34:05

you know, the windows and the

34:07

materiality will probably be one of the

34:09

biggest things. Um but uh you know, I

34:12

think given the number of windows that

34:15

they have up there. And I know in in

34:17

some cases when we're talking about a

34:18

composite, a wood composite window, uh

34:21

that we've heard from several property

34:25

owners that you get to a certain size

34:27

and and the manufacturers just aren't

34:29

making those and maybe you can go

34:31

special order these. But um I think we

34:34

also in the consideration of everything

34:36

that's being proposed as part of this

34:37

reconstruction is, you know, what's it

34:40

going to cost? Because this is not a

34:41

simple this is not a single home. This

34:43

is like a really large building and you

34:46

know I don't know I don't know myself

34:49

where necessarily all the money is

34:50

coming from whether this is from the

34:52

insurance payout and therefore you know

34:54

it's somewhat limited in terms of what

34:56

resources we have available um but uh

34:59

you know making sure that I think first

35:01

and foremost that the building becomes

35:04

uh gets back up and running and is

35:06

brought code compliant. I know this is

35:07

another uh topic of uh issue that the

35:10

board has discussed of you know what is

35:12

permissible as far as a new alternative

35:14

material if the greater interest in the

35:16

retention of the building, the longevity

35:18

of the building. Um you know making sure

35:20

that the property is something that

35:22

people are going to want to buy and

35:23

invest in and live in in the future is a

35:26

consideration

35:28

uh for um for the board. Um and you know

35:32

I think this in many cases these issues

35:34

that might have been uh you know

35:38

secondary or even tertiary in some cases

35:41

um in other reviews really come to the

35:45

four in a in a project like this given

35:48

its visibility given its importance you

35:50

know um and so yeah I think there is

35:55

certainly those questions of well was

35:56

that a metal roof do we want to allow

35:58

aluminum clad windows Um, and you know,

36:02

it's definitely something uh that again

36:05

I know the project team has spent a lot

36:08

of time investigating and researching

36:10

on. Um, and you know, their point about

36:14

the the maintenance of it is a good

36:17

point because again there's a lot of

36:19

windows in these buildings and um if if

36:23

it's there have to be wood windows and

36:25

we're having to have you know the

36:27

facilities uh department go out there

36:29

and paint every other year, every third

36:32

year. Um, you know, do we have the

36:35

capacity to be able to do that? Do we

36:37

have the resources to be able to fund

36:39

those things on

36:48

kind

36:53

of

36:55

retreated kind of

37:00

I would think that we should at least

37:02

see some comparison moneywise

37:06

to size.

37:11

Um and

37:19

um kind

37:23

of I think what you're

37:25

saying yes essential

37:30

everything this is our big

37:33

show and I'm not sure

37:36

this complies on a whole list

37:42

material and I do think

37:46

it's research

37:48

on

37:50

some windows to see

37:53

if

37:57

material and at least be able to show us

38:01

due

38:06

and I I'm sure um

38:11

national secretary of interior standards

38:13

will come into play as well. We we

38:16

strive to follow. Um so when it talks

38:21

about windows there we

38:23

may also because of the high

38:27

profile situation for this building we

38:30

may want I I'm wondering about positive

38:34

that's even appropriate. I do understand

38:38

the new growth wood is not what the old

38:41

growth would lipan right

38:46

so yeah windows are always a

38:49

complication so we'll have to do some

38:51

due diligence reading through the

38:53

secretary of interior

38:55

standards and don't know if there are

39:00

restrictions funding

39:03

sources also bring

39:07

We

39:17

are

39:19

certainly but I I'm not

39:30

sure and we do have a cost comparison of

39:35

what

39:38

However, I think it's worth questions

39:48

extremely

39:55

expensive. I personally I would not

40:16

If you

40:19

were able to

40:23

match this in the

40:37

comments and they would all be

40:43

Now, going back to the doors, they are

40:45

wood doors that you're looking at or are

40:47

they plaid? Also,

40:50

we're looking to use wood on the

40:52

exterior side doing a similar vest

41:08

on your interior doors. Okay. We don't

41:11

have perview of

41:12

but we want to have the true on the

41:16

exterior but we have to keep the

41:18

envelope. So we're keeping

41:51

Okay. So, I think we've reviewed

41:54

everything. Um, question.

41:57

Yes. Thank you. I was just there on

42:00

brick.

42:10

Yeah, we're gonna try to

42:22

read. There's a whole brick stud we're

42:24

doing too. Each brick actually sections

42:27

are all different and they're also all

42:29

different

42:32

brick same way.

42:44

First of all, thank you for the word

42:47

because I've been a preservation

42:49

professional for

42:51

almost

42:57

that

43:01

photo. I'm wondering if you could

43:12

They did try.

43:16

Yeah, they could try

43:20

add one of the things.

43:30

Well, all the trains and doors were able

43:33

to get in right

43:46

Will you go with a traditional limestone

43:49

mortar or you going to go with a

43:53

type

44:01

softer the

44:03

bricks and we're doing additional

44:07

testing?

44:28

Sorry. It's tough to get

44:46

foundation. You can see that

44:50

moisture almost.

45:01

I would think any weak holes are covered

45:04

by the concrete sidewalk as well.

45:14

So, um, if you're furring out the

45:17

interior with stud, I imagine that will

45:19

be some sort of plaster drywall to

45:22

represent and some insulation. So, are

45:25

you putting a big barrier in? Are you

45:27

doing spray insulation or you

45:31

which is the vapor barrier.

45:39

So there's there's two processes right

45:42

now investigating. So one of them is you

45:45

see the down there. So we're thinking

45:48

there might be compromise in the line

45:52

once it

45:53

gets at the

45:55

bottom. Um the other thing we're

45:58

studying is the the water level. Um

46:02

basically

46:15

So we're getting

46:17

pricing on

46:21

it doesn't make sense to go through this

46:22

whole restoration.

46:39

Um to my point about the vapor barrier,

46:42

old buildings would breathe, right? So

46:46

now we're adding this vapor barrier um

46:49

to air conditioning as part of the HVAC.

46:53

Um so that makes me

46:56

think obviously we need a vapor barrier

46:58

so that we don't destroy the

47:01

brick cause other issues but um HVAC

47:07

is something that we don't always get to

47:10

see before it's applied to a building.

47:13

So, where and how are you planning

47:17

to where are you putting the equipment?

47:20

Where are you putting the

47:21

chiller rooftop units or whatever?

47:27

We're still

47:28

working. Um, we have a central central

47:32

plaz

47:35

that both stone building

48:00

you don't have any boiler

48:01

mechanical room in this this building or

48:04

in the stone building. Correct.

48:14

So you'd have some sort of access way in

48:17

the plaza. Yes.

48:22

Bricks or whatever happens, right?

48:34

There's also in your picture some

48:36

electrical equipment. Looks like that's

48:54

nice to clean up some of inevitable

49:00

spaghetti. So I like the underground

49:02

approach for that as well. If we can

49:05

create some sort of confident

49:12

Are you doing anything? Um, are any of

49:14

those exterior 1990s tables around the

49:18

perimeter of the brick

49:20

building? I know they're in front of the

49:22

stone. They are.

49:25

Do you have any plans for those?

49:45

stone on the outside of around the

49:49

perimeter. Um, pretty much at the curb

49:51

line of the sidewalk, there's uh some

49:54

posts with tables that were intended to

49:57

give you, you know, the the thing that

50:00

happened inevitably was in the in the I

50:03

think so in the plaza people have set

50:06

set up um tents and tables but those

50:10

were intended to be able to be pulled

50:12

out and used without bringing your own

50:14

table

50:22

I've never I've never seen them in Yeah.

50:51

I don't know that it's a feature.

50:53

Although I'm curious to find out what my

50:57

my guess is that I've always thought

50:59

about this too is my guess is it was

51:02

probably supposed to replicate when

51:04

there were wooden extensions on the

51:06

outside of the building. Um and there

51:08

were stands I think in the almost like a

51:10

modern equivalent of of that was

51:13

obviously uncovered and you know

51:15

unencloed but it was kind of intended to

51:17

replicate the activity that would occur

51:19

on the sides of the boat.

51:30

last major renovation.

51:36

So next month you'll also talk more

51:40

about the second phase and third

51:44

potential phase.

51:46

Um, so what can you talk to us about a a

51:49

little bit about how you're approaching

51:51

the construction of the project?

51:55

You're doing just the brick

51:57

building initially, right?

52:04

In May, I think we were still only

52:07

focused on the brick building because

52:09

that's piece that everyone wants to see

52:12

expedited and completed. Um,

52:16

We're still knocking out what

52:38

exactly are you

52:46

I think we would probably pick one of

52:51

those,

52:52

but we were only

53:08

able colors.

53:20

When you go with the insulated glass

53:24

windows, it looks like in this picture

53:26

there

53:37

At first,

53:47

sorry,

53:54

but you're not because you have

53:56

insulated glass, you won't need any

53:57

storms.

54:13

DC

54:18

heat in the winter.

54:26

[Music]

54:32

lockable.

54:38

Yeah, I don't there there are several

54:40

double hungs on the ground.

54:54

So when they are fixed double hung do

54:57

they have the offset?

54:59

Yes, they basically just

55:02

like they

55:09

just so I really don't think

55:22

it's made. It's really more

55:25

functionality

55:27

issue. If

55:29

particular vendor that's near a window

55:31

goes and opens it and then the AC's

55:33

running there's going to

55:35

be

55:37

there that's not

56:01

This is David Baker. He's our facilities

56:03

manager.

56:18

Seems like

56:42

so for

56:44

ventilation and air change. Do you need

56:47

any lers?

56:54

Well, we don't know where the equipment

56:55

is yet, so you don't know if you're

56:57

going to need loopers. But if you

57:00

propose putting one of making one of

57:02

these openings into a looper, I think we

57:04

would want to know that

57:17

Well, I can't speak for everyone, but I

57:19

appreciate the attention to detail on

57:23

this landmark building for us in

57:31

Harrisburg. And I'm really happy to be

57:34

here tonight and to see movement on the

57:36

project as

57:37

well.

57:39

Been eagerly

57:44

waiting. I think you heard from some of

57:48

team testimony. There's a lot of

57:50

research that

57:51

way analyzing samples. Um this was not I

57:56

think show up and say okay we're going

57:58

to do this this and this. It's like

58:00

understand the building to

58:03

understand life and

58:06

building doesn't seem to me that uh from

58:09

my conversation our discussions I can

58:12

see notions about how this was supposed

58:14

to be

58:16

done analysis of the actual building. I

58:19

think a lot of what you heard here is a

58:22

response to what they found

58:25

investigator.

58:28

Should I open the floor? Comments from

58:30

the public? David, anybody?

58:35

You're both David. So,

58:42

all right. Well, then I guess I have to

58:44

take a motion for adjournment. I'll make

58:46

a motion to adjurnn. Second. All those

58:49

in favor say I. I. Motion carries. Thank

58:52

you for your time. Thank you.

Continue with YouTLDR

Analyze another video with Pro

Process a new video, search every timestamp, compare sources, and keep the result in your library.

Get Pro — $12/month30-day money-back guarantee

More transcripts

Explore other videos transcribed with YouTLDR.